Engineering glossary

The terms as we use them in our drawings, bills of quantities and contracts, in Arabic and English. Type in the search box to filter the list.

76 terms

Design

Construction drawingsمخططات تنفيذية
Detailed drawings used to build the work on site after design approval, including dimensions, levels and details.
Shop drawingsمخططات الورشة
Drawings prepared by the contractor or fabricator showing how items are made and installed, approved by the consultant before execution.
As-built drawingsمخططات ما بعد التنفيذ
Drawings updated to match what was actually built, handed over in the close-out file.
Design briefبرنامج الاحتياجات
A document defining the client’s requirements, spaces, functions and budget before design starts.
Concept designالتصميم المفاهيمي
The first design stage: idea, massing and general layout without construction detail.
BIM (Building Information Modelling)نمذجة معلومات البناء
A 3D digital model carrying element information, used for coordination and quantity take-off.
3D visualisation (rendering)إخراج ثلاثي الأبعاد
Realistic images of the design produced from a 3D model for presentation and approval.
Levelالمنسوب
The vertical height of a point relative to a datum (zero level).
Sectionالمقطع
A drawing showing the building as if cut vertically to reveal floors, heights and internal details.
Elevation (facade)الواجهة
A drawing of the building’s external face showing openings, materials and heights.

Structure & materials

Reinforced concreteخرسانة مسلحة
Concrete containing steel reinforcement to resist the tensile forces concrete alone cannot carry.
Reinforcement (rebar)حديد التسليح
Steel bars placed inside concrete per bar-bending schedules to strengthen structural elements.
Bar bending schedule (BBS)جدول تفريد الحديد
A schedule listing the diameter, length, shape and number of reinforcement bars per element.
Footings (foundations)قواعد
Structural elements that transfer the building loads to the soil.
Ground beam (tie beam)ميدة
A ground-level beam tying the footings and carrying walls at ground level.
Solid slabبلاطة مصمتة
A concrete slab of uniform thickness without voids, common for small and medium spans.
Hollow-block (ribbed) slabبلاطة هوردي
A slab with concrete ribs between hollow blocks to reduce weight and increase spans.
Concrete grade (compressive strength)إجهاد الخرسانة
The characteristic compressive strength of concrete at 28 days, e.g. C30 or 300 kg/cm².
Slump testاختبار الهبوط
A simple site test measuring the consistency and workability of fresh concrete.
Curingمعالجة الخرسانة
Keeping concrete moist and at temperature after pouring so it reaches its design strength.
Steel structureهيكل معدني
A structural frame of steel sections connected by welding or bolts, protected from corrosion by coating.
Cantileverكابولي
A structural element fixed at one end and free at the other, such as balconies and canopies.
Expansion jointفاصل تمدد
A joint allowing the building to expand and contract thermally without cracking.
Waterproofingعزل مائي
Layers preventing water ingress into structural elements or spaces, such as bituminous membranes and cementitious coatings.
Thermal insulationعزل حراري
Materials reducing heat transfer through walls and roofs, required by the Saudi Building Code.
GRC (glass-fibre reinforced concrete)خرسانة مسلحة بالألياف الزجاجية
A cement mix reinforced with alkali-resistant glass fibres, lightweight, used for facades and ornament.

Finishes

Plaster (render)لياسة (بياض)
A cement or gypsum layer applied to walls to level them before paint or cladding.
Putty (skim coat)معجون
A thin smooth layer over plaster preparing the surface for paint.
Emulsion paintدهان إيمولشن
Water-based paint for internal walls and ceilings, in various sheen levels.
Suspended (false) ceilingأسقف مستعارة
A secondary ceiling hung below the structural slab to conceal services and improve acoustics and lighting.
Gypsum board (drywall)جبس بورد
Gypsum panels on metal framing for dry walls and ceilings.
Porcelain tilesبورسلين
High-density, low-absorption ceramic tiles suited to heavy-use floors.
Marbleرخام
A natural stone used for floors, walls and stairs, requiring periodic surface protection.
Waterjet cuttingقطع بالماء
Cutting marble and tiles with a high-pressure water jet to produce precise shapes and patterns.
Parquet (wood flooring)باركيه
Natural or engineered wood flooring laid over an underlay.
HPL claddingواجهات HPL
High-pressure laminate panels resistant to weathering, used for facade cladding.
Aluminium composite cladding (ACP)كلادينج
Aluminium composite panels for facade cladding; a fire-rated core must be selected per the fire code.
Gypsum ornamentزخارف جصية
Classical decorative elements cast in gypsum for ceilings, cornices and internal columns.
Flexible polyurea sealantحشوة بولي يوريا مرنة
A flexible joint filler tolerating movement and chemicals, used in industrial floors.
Surface preparationتجهيز الأسطح
Cleaning a steel surface to a specified grade (e.g. SSPC-SP 10) before coating to ensure adhesion.
Dry film thickness (DFT)سماكة الطبقة الجافة
The thickness of a coating after drying, measured in microns and checked against the specification.

Quantities & pricing

Bill of quantities (BOQ)جدول الكميات
A list of work items with description, unit and quantity, priced item by item.
Quantity take-offحصر الكميات
Extracting quantities from drawings under defined measurement rules, with a reference for every figure.
Unit rateسعر الوحدة
The item price per unit of measure, built from material, labour and equipment then indirect costs and profit.
Direct costالتكلفة المباشرة
The sum of material, labour and equipment cost of an item excluding overheads.
Indirect costs (overheads)المصاريف غير المباشرة
Site and head-office costs not attributable to a single item, added as a percentage.
Waste allowanceالهالك
A percentage added to material quantities to cover cutting, damage and site loss.
Provisional sumمبلغ احتياطي
An amount included in the contract for work not yet defined, spent on actuals.
Lump-sum contractعقد المبلغ الإجمالي
A fixed-price contract for a defined scope; the contractor carries the quantity risk.
Re-measured contractعقد إعادة القياس
A contract paid on actually executed quantities multiplied by unit rates.
Engineer’s estimateتقدير المهندس
The cost estimate prepared by the consultant or owner to compare contractor offers.
Turnkeyتسليم مفتاح
Delivering the complete project ready for use with one party responsible for design and construction.

Contracts & management

FIDIC contractsعقود فيديك
International standard forms of engineering contract defining rights, notices, claims and change management.
Variation order (VO)أمر تغيير
A written instruction changing scope, quantity or specification, with its price and time effect.
RFI (request for information)طلب معلومات
A formal request from the contractor to clarify a gap or conflict in drawings or specifications before execution.
NCR (non-conformance report)تقرير عدم مطابقة
A report recording work or material not meeting the specification, with root cause and corrective action.
Payment application (IPC)مستخلص
A periodic payment request based on approved progress and executed quantities.
Retentionاحتجاز الضمان
A percentage withheld from each payment and released after handover or the defects period.
Delay damages (liquidated damages)غرامة تأخير
An agreed sum deducted per day of delay after the contractual completion date, capped in the contract.
Extension of time (EOT)تمديد المدة
The contractor’s entitlement to additional time for delay not of its making, subject to timely notice.
Baseline programmeخط الأساس
The programme approved at project start against which progress is measured.
Critical pathالمسار الحرج
The sequence of activities where any delay delays project completion.
Minutes of meeting (MOM)محضر اجتماع
A written record of what was discussed and decided, with the owner and due date of each action.
Handover certificateمحضر استلام
A document evidencing the client’s acceptance of the works and start of the defects period.
Defects liability periodفترة الضمان
The period after handover during which the contractor must repair defects at its own cost.
Etimad platformمنصة اعتماد
The Saudi government platform for publishing tenders and submitting bids.
Tender documents (conditions)كراسة الشروط
The documents defining tender conditions, specifications and evaluation criteria.

Safety & quality

Risk assessmentتقييم المخاطر
Identifying hazards in each activity, estimating likelihood and severity and setting controls before work starts.
Permit to workتصريح عمل
Written authorisation for hazardous work (hot work, work at height, confined spaces) under set conditions.
Method statementبيان طريقة العمل
A step-by-step description of how an activity will be carried out safely and to specification.
PPEمعدات الوقاية الشخصية
Helmet, high-visibility vest, safety boots, glasses, gloves and harness as the activity requires.
Near missحالة وشيكة
An event that nearly caused injury or damage, reported and analysed to prevent recurrence.
Quality control planخطة ضبط الجودة
The list of inspections, tests and hold points for each activity and who approves them.
Inspection request (IR)طلب فحص
A formal request from the contractor to the consultant to inspect work before the next stage.
Material submittalاعتماد مواد
A request to approve a material or product with manufacturer data and samples before supply.
Snag list (punch list)قائمة الملاحظات
A list of incomplete or defective items to be completed before final handover.