Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Site supervision

الإشراف الهندسي

An engineering office checking construction against drawings and specifications.

Category: Contracts & management

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Site supervision is an approved engineering office following the works on site: inspecting stages and materials, answering queries, recording comments and confirming compliance with the permit, drawings and code. For residential buildings it is required during the main construction stages.

Why it matters on a project

It protects the owner from errors he cannot see, especially in work that disappears under concrete and finishes. The supervisor's report is also needed for the completion certificate.

Measurement and pricing

Priced as a monthly fee, by number of visits or as a percentage of works value, depending on project size and the level of supervision.

Common mistake

Relying on infrequent visits that miss steel inspection before each pour, so errors pass unnoticed.

Frequently asked questions

Is supervision mandatory for villas?

Building rules require an approved engineering office to supervise the main stages, with Balady setting requirements for each case.

How does supervision differ from project management?

Supervision checks technical compliance; project management also covers cost, time and contracts.

Related terms

Read next

Does your project need engineering consultancy and project management? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote