Structural works
Concrete footings, columns and slabs; steel structures and cantilevers for extensions.

Home / Contracting
We build the structure, finishes and classical ornament for palaces, villas and commercial buildings through to handover, with engineering supervision and quality control at every stage.
Services
Concrete footings, columns and slabs; steel structures and cantilevers for extensions.
Flooring, marble, gypsum, ceilings, painting, joinery and furnishing.
Coffered gypsum ceilings, capitals, gilded cornices and GRC facade cladding.
Hardscape, pergolas, classical columns and swimming pools.
We coordinate and deliver these with specialist subcontractors for HVAC, fire protection and electrical systems.
We coat industrial structures and equipment using rope-access teams working to the IRATA system.
Deliverables
From the team's experience
Industrial & work at height
Our rope access teams, working to the IRATA system, carry out coating, maintenance, installation and inspection at height.

We visit sites in Saudi Arabia and Egypt to see the works before we price them, on a date agreed with you.
Register your company and we will get in touch when one of our projects needs what you offer.
Further reading


Finishes, civil works, joinery, waterproofing, ornament and facades. MEP is coordinated with a specialist contractor or added under a separate agreement.
An advance payment, then monthly applications by documented progress (photos and measurements), with retention released after handover.
Yes, a critical-path programme in Primavera P6 attached to the contract and updated monthly.
A one-year defects warranty on finishes, ten years on waterproofing per the approved system, and manufacturers’ warranties on materials.
We fit out commercial offices and head offices, from glass partitions, suspended ceilings and lighting to fixed joinery and reception, with the same method: shop drawings before work starts, a site engineer and a weekly report. Work by our team: head office fit-out in Riyadh, corporate office fit-out and office lobby with a crystal feature ceiling.
Contact us
Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.