
Sector
Industrial & sensitive facilities
We coat steelwork, work at height on ropes and build service buildings inside operating plants.
Inside a plant or a port, nothing starts without a daily permit and a risk assessment for that specific task. The facility keeps running, so we work in tight time windows and do not overrun them.
Our founding team has repainted port cranes on ropes, with no scaffolding, and designed service buildings inside industrial sites, including 3D visualisations. We work to SSPC surface-preparation grades and the client’s approved coating systems.
What we deliver in this sector
Typical scope
- Surface preparation to SSPC-SP cleanliness grades before coating
- Multi-coat systems for steel structures, cranes and tanks
- Work at height by rope access with a rescue plan
- Service buildings, canopies and warehouses inside facilities
- Permit, access and shutdown-window coordination
- Photographic and measurement records before, during and after
Frequently asked
Can you work while the facility is operating?
Yes, provided work windows, hot-work and work-at-height permits are coordinated with facility management, which we handle within the safety plan.
Which references do you work to for industrial coatings?
Surface preparation to SSPC-SP 5/6/10 and coating systems per the client specification and manufacturer data sheet, with dry-film thickness measured and recorded.
Selected projects in this sector
Other sectors



Contact us
Discuss your project with us
Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.


