Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Indicative cost guide 2026

Published reference figures from independent bodies to size a project budget before detailed pricing. Every figure carries its source and year and is not an Arab Creators offer; actual pricing is built from drawings item by item.

Construction cost in Saudi Arabia by asset type

Asset typeCostSource
Commercial CBD offices, A-grade (up to 20 floors)Saudi riyal 9,000 /m²Turner & Townsend, KSA Market Intelligence 2025
Hotels: 3 starSaudi riyal 12,000 /m²Turner & Townsend, KSA Market Intelligence 2025
Hotels: 5 star luxurySaudi riyal 22,500 /m²Turner & Townsend, KSA Market Intelligence 2025
Industrial: large warehouseSaudi riyal 8,000 /m²Turner & Townsend, KSA Market Intelligence 2025
Industrial: advanced manufacturingSaudi riyal 9,000 /m²Turner & Townsend, KSA Market Intelligence 2025
Retail: automotiveSaudi riyal 10,000 /m²Turner & Townsend, KSA Market Intelligence 2025
Residential: high-rise apartmentsSaudi riyal 8,500 /m²Turner & Townsend, KSA Market Intelligence 2025
Riyadh average construction cost 2025US$3,112/m² (2025) vs US$2,593/m² in 2024Saudi riyal 11,670 /m²Turner & Townsend, KSA Market Intelligence 2025

Office fit-out cost

Asset typeCostSource
Riyadh office fit-out: low specification€1,378/m²Saudi riyal 5,900 /m²Cushman & Wakefield, Office Fit Out Cost Guide EMEA 2026 (prices Dec 2025)
Riyadh office fit-out: medium specification€2,050/m²Saudi riyal 8,770 /m²Cushman & Wakefield, Office Fit Out Cost Guide EMEA 2026 (prices Dec 2025)
Riyadh office fit-out: high specification€2,950/m²Saudi riyal 12,630 /m²Cushman & Wakefield, Office Fit Out Cost Guide EMEA 2026 (prices Dec 2025)
Riyadh high-spec office fit-outUS$3,864/m²; Dubai and Abu Dhabi US$3,499/m²Saudi riyal 14,490 /m²Turner & Townsend, Office Fit-Out Cost Guide 2025
Cairo office fit-out: low / medium / high€1,699 / 1,769 / 2,225 per m²7,270-9,520 SAR/m²Cushman & Wakefield, Office Fit Out Cost Guide EMEA 2026 (prices Dec 2025)

International fit-out guides describe corporate headquarters to global standards and usually include MEP, furniture and audio-visual systems; simpler local fit-outs cost considerably less: which is why we ask for drawings and scope before any figure.

Conversion: US$1 = SAR 3.75 (pegged); €1 ≈ SAR 4.28 on 23 September 2026 (exchange-rates.org).

Price trend

Preliminaries in Saudi Arabia
expected to rise by about 5-7% in 2025Turner & Townsend, KSA Market Intelligence 2025
Steel and cement
up 5-10% since 2023, with most major materials trending upward over 12 monthsTurner & Townsend, KSA Market Intelligence 2025
Construction cost escalation in Riyadh, Abu Dhabi and Dubai
forecast 5.0% through 2025Turner & Townsend, Global Construction Market Intelligence 2025

Early-estimate calculator

Result = area × the published reference figure; an early estimate (Benchmark) to size the budget only, not a substitute for a bill of quantities from drawings.

Why the final price can differ from the guide figure

We price from drawings item by item: material, labour and equipment, then indirect costs and margin: so the price changes with specification, location and programme.

A fixed price list binds you and us to numbers that do not reflect your project; the reference figures above size the budget, the bill of quantities sets the price.

Send the drawings and within one working day you receive a written quotation stating inclusions and exclusions.

Contact us

Discuss your project with us

Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Riyadh Site visits and project coordination
Working hours Sunday to Thursday, 9:00 to 18:00 Riyadh time
Contact card Save to contacts