Policy, organisation & responsibilities
We write the HSE policy, draw up the safety organisation chart and set out who is responsible for what at company and project level.

Home / Occupational health & safety systems
We set up occupational health and safety management systems for companies and projects of every type, from the policy and procedures through to site plans, forms, training and follow-up.
HSE plan, small or medium projectPriced per: plan
Services
We write the HSE policy, draw up the safety organisation chart and set out who is responsible for what at company and project level.
We write the OH&S management system manual and its procedures against the requirements of ISO 45001.
We build the risk register, assess each activity, carry out job safety analyses (JSA) and set the controls.
Project HSE plans, emergency and evacuation plans, and safety requirements for subcontractors.
Permit-to-work system, checklists, and scheduled site and equipment inspections.
Incident reporting and investigation procedures, training and awareness plans, and performance indicators with periodic reports.
Deliverables
Set up the system
We prepare the system and its documents and help you get ready for audit. The ISO 45001 certificate itself is issued by an accredited certification body.
Fixed prices from our 2026 price list, before 15% VAT. All packages · Quote calculator
Yes. We prepare a project HSE plan covering risk assessment, permits to work, emergency plan and training, meeting client and authority requirements.
Yes. We build the procedures on ISO 45001 requirements so they can be certified later. The certificate itself comes only from an accredited body.
Leading indicators (inspections, training, near-miss reports) and lagging indicators (recordable injury rate) in a monthly report.
Yes. We run a safety induction on entry and training for work at height, confined spaces and hot work, with attendance certificates.
Contact us
Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.