Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy
Raft foundation reinforcement for a villa

Home / Engineering consultancy / Shop drawings & quantity take-off

Shop Drawings & Quantity Take-off for Every Discipline

A complete set of shop drawings within 24-48 hours for villas and mid-size buildings, and tender quantity take-off within 72 hours. Larger projects are scheduled on order.

Shop drawings (architectural, structural, MEP)Priced per: A1 sheet

Starting from · before VATSaudi riyal 165
Minimum orderSaudi riyal 1,500
On every project
1 working day to a fixed quote
24-48 hours to delivery
2 consultant-comment rounds included
NDA on request, signed before files are received

Disciplines

Shop drawings for every discipline on the project

Architectural

Setting-out, wall types, finishes, reflected ceiling plans, and door and window schedules.

Structural

Formwork, rebar detailing and bar bending schedules to SBC 304 / ACI 318.

Electrical

Power and lighting layouts, circuiting, distribution board schedules, low current systems and risers.

Plumbing & drainage

Routing, slopes, invert levels, risers and fixture schedules.

HVAC

Duct and pipe routing to SMACNA, coordination sections and equipment schedules.

Fire-fighting

Sprinkler layout and zoning to NFPA 13 / SBC 801, hydrants and pumps.

Fire alarm

Devices and loops to NFPA 72.

Deliverables

What you receive

DWG & PDF drawings Editable files, plus PDF sets ready for printing and approval.
Coordinated MEP sections Sections coordinated across HVAC, plumbing, electrical, fire-fighting and structure.
Quantity take-off & priced BOQ In Excel, with every item linked to the drawing it was measured from.
Title blocks in your name Sheets issued under your company title block on request.

How it works

Four steps from drawings to delivery

01

Send your drawings

Send the IFC (issued for construction) or tender drawings.

02

Fixed quote

We review the drawings and send a fixed quote within one working day.

03

50% advance

Work starts as soon as the advance payment is received.

04

Delivery

Drawings are delivered for review; DWG files are released after final payment.

Who it is for

Who we prepare shop drawings and take-offs for

Contractors Shop drawings and quantities ready to submit to the consultant and start work.
MEP & fire-protection subcontractors System-by-system drawings with equipment and material schedules.
Fit-out companies Ceiling, finishes and door and window drawings and schedules.
Engineering offices Overflow production capacity when workload peaks, under your title block on request.
Developers An independent take-off to check contractor quotations against.

See a sample set

Four A1 sheets for a residential villa: architectural, structural, HVAC and fire protection: free to download.

View the sample

Frequently asked about this service

What is the turnaround?

A complete set for villas and mid-size buildings within 24-48 hours, and tender quantity take-off within 72 hours. For larger projects, the delivery schedule is set out in the quotation.

Which file formats do you deliver?

Drawings in DWG and PDF; quantity take-off and priced BOQ in Excel. We accept your drawings in DWG or PDF.

How many revisions are included?

Two rounds of revisions on consultant comments are included. Anything beyond that, or changes arising from a change in the design itself, is agreed with you before it is carried out.

Do you keep my drawings confidential?

Yes. We sign a non-disclosure agreement (NDA) on request, before we receive your files, and never use or publish your drawings for any other purpose.

How does pricing work?

Per sheet or per square metre, depending on the project and the disciplines required. We price after reviewing the drawings and send a fixed quote within one working day.

Try us before you sign

A free quantity take-off of one sheet, delivered within two days

Send one drawing sheet (PDF or DWG) on WhatsApp and get a free quantity take-off of it, delivered within two days. One sheet per client, quantities only (no pricing), villas and mid-size buildings.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Riyadh Site visits and project coordination
Working hours Sunday to Thursday, 9:00 to 18:00 Riyadh time
Contact card Save to contacts