Saudi Arabia · Egypt Client portal +966 59 700 9855 a.fathy@arabcreators.co
Arab Creators Engineering Consultancy
Existing-condition 3D model of a house built from the survey data

Home / Engineering consultancy / Survey and laser scanning

Survey and 3D laser scanning of existing buildings

We capture existing buildings and land accurately and hand you as-built drawings and BIM models ready for design, refurbishment and take-off. Field work is done by a licensed office; processing, drafting and review by our team.

Survey and laser scanningPricing unit: m²

Drawings from · excl. VAT3 Saudi riyal
Minimum order3,000 Saudi riyal
On every project
1 working day for a fixed quote
±5 mm point cloud registration
±10 mm drawing accuracy
NDA on request

Scope

What you receive

Registered, cleaned point cloud in E57 and RCP with panoramas
Plans, levels, sections and internal elevations in DWG and PDF
Window and door schedule with measured sizes
Visible HVAC, drainage, electrical and fire routes
Revit model at LOD 200 or 300 ready for coordination
Land surveys with boundaries, spot levels and contours
Cut and fill volumes with sections and a quantity table
Accuracy report with control method and results

Prices

Published prices

ServiceCodePrice (SAR)UnitMinimum
3D laser scanning with registered point cloudSRV-SCAN8m²12,000
As-built drawings from the point cloudSRV-S2C3m²3,000
Visible MEP as-built layoutsSRV-MEP2m²2,000
Revit model, LOD 200SRV-S2B5m²5,000
Revit model, LOD 300SRV-S2B39m²9,000
Land survey up to 1,000 m² with CAD planSRV-TOPO1,600plot1,600
Topographic survey of large sitesSRV-TOPOHA3,800hectare7,600
Cut and fill volumes (up to 1 ha)SRV-VOL950site950
Survey data check (up to 200 points)SRV-CHK1,200submission1,200

Prices exclude 15% VAT in Saudi Arabia. Order value is the greater of quantity × price or the minimum; the final price is fixed in the offer after reviewing drawings or a partner visit.

What 3D laser scanning is

A laser scanner measures millions of points in minutes from each set-up, and the set-ups are joined into one point cloud of the building as it stands. From that cloud we draw plans, sections and elevations and build a Revit model, so design and refurbishment start from reality, not from old drawings.

It suits existing buildings before renovation or change of use, buildings with no reliable drawings, and recording exposed services before finishing or maintenance works.

Who works on site

Field survey work in Saudi Arabia needs a GEOSA licence, so it is done by a licensed survey office we contract, with a Leica RTC360 or Trimble X12 class scanner. Our team receives the cloud, checks the registration, then drafts, models and reviews.

If you already have a point cloud in E57, RCP, RCS or LAS, we work on it remotely for any Gulf country or Egypt, with no site visit.

Land surveys and Balady reports

A land survey covers boundaries, spot levels and a design-ready CAD plan with contours, and cut and fill volumes on request. The official survey report through Balady is issued by the licensed office, and government fees are paid directly.

Price

Example: an existing 650 m² villa with scanning, drawings and an LOD 200 model, each line at its minimum: 12,000 + 3,000 + 5,000 = SAR 20,000 before VAT. A 3,000 m² office floor from the client point cloud: drawings 9,000 + visible MEP 6,000 = SAR 15,000 before VAT.

Drawings are prepared for review, approval and stamping by the consultant or licensed engineer in the project country, and a second engineer reviews the files before delivery.

Before we start

What we need from you

Building or land location and recent photos
Approximate area and number of floors
Required output: drawings, BIM model or quantities
Available site access times
Existing point cloud, if any

How we work

Four steps from site to delivery

01

Scope

Send location, area and deliverables; we reply with a fixed quote within one working day.

02

50% advance

We book the scanning day with the partner on receipt.

03

Scan and process

Field scanning, then registration, cleaning, drafting, modelling and review.

04

Delivery

DWG, PDF, RVT and E57 with an accuracy report and two revision rounds.

Our work: an existing house surveyed to an AutoCAD sheet and a 3D model

As-built survey plan of an existing house with grid axes and dimensions

Sheet SV-101: survey plan with axes, dimensions and room schedule, 1:100, Riyadh, October 2026

Existing-condition 3D model of a house built from the survey data

Existing-condition model from the same survey, 3ds Max with photo finishing

Setting-out plan and survey check of steel canopy pedestals with coordinate tables

Site survey check for steel canopy pedestals: setting-out coordinates and surveyed bays against design in mm, Jazan, October 2026

Frequently asked questions

Do you own laser scanners?

Field work is done by a GEOSA-licensed survey office under contract to us; our team checks, drafts and models and is responsible to you for the delivery.

I already have a point cloud. Can you use it?

Yes, in E57, RCP, RCS or LAS, remotely for any Gulf country or Egypt.

Do you issue the Balady survey report?

The licensed partner office issues it, and we deliver a design-ready CAD plan with it.

How long does scanning take?

A crew covers about 1,800 m² a day in fitted-out buildings and more on open floors; drafting time is set in the offer by area and scope.

How accurate are the results?

Point cloud registration ±5 mm and drawings ±10 mm, with an accuracy report on delivery.

Try us before you sign

A free quantity take-off of one sheet, delivered within two days

Send one drawing sheet (PDF or DWG) on WhatsApp and get a free quantity take-off of it, delivered within two days. One sheet per client, quantities only (no pricing), villas and mid-size buildings.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Riyadh Site visits and project coordination
Working hours Sunday to Thursday, 9:00 to 18:00 Riyadh time
Contact card Save to contacts