Home / Engineering consultancy / MEP design
MEP design for all systems
Full MEP design for villas and commercial and office buildings, with documented load calculations and drawings coordinated between disciplines before they reach site.
MEP designPriced per: m²
Systems we design
- HVAC and ventilation: cooling load calculations, equipment selection, duct routes, ventilation and extract.
- Water supply and drainage: cold and hot water, foul and storm drainage, tanks and pumps.
- Power and lighting: load calculations, distribution boards and single-line diagrams, interior and exterior lighting.
- Fire fighting and alarm: sprinkler and hose reel networks, detection and alarm systems, to civil defence requirements and the adopted code.
- Low current: data networks, CCTV and communications.
Coordination between disciplines
The combined services drawing brings system routes in ceilings and shafts together and resolves clashes with structure and architecture before construction, followed by coordinated MEP shop drawings for each system.
Prices
Fixed prices from our 2026 price list before VAT. Estimate your project in the quote calculator.
| Service | Price (SAR) | Unit | Minimum |
|---|---|---|---|
| MEP design | 15 | m² | 8,000 |
| Coordinated MEP shop drawings | 175 | sheet (A1) | 1,500 |
| Combined services drawing | 350 | floor | 2,000 |
Licensing note
We provide the technical work remotely. Drawings needing an official stamp or civil defence approval in the project's country go through an engineering office licensed there.
Frequently asked questions
Which systems does MEP design cover?
HVAC and ventilation, water supply and drainage, power and lighting, fire fighting and alarm, and low current, with load calculations and the combined services drawing.
What does MEP design cost?
15 SAR per m² before VAT with an 8,000 SAR minimum; coordinated shop drawings 175 SAR per sheet and the combined services drawing 350 SAR per floor.
Do you coordinate MEP with structure?
Yes, through the combined services drawing, which resolves clashes in ceilings and shafts before construction.
