Home / Redesign
Redesign
An existing plan that no longer fits, a villa layout you want to change, or an office moving to a new use? We re-plan and develop the design, and update every architectural, structural and MEP sheet the change touches.
What is included
- Review of the existing drawings and site photos, and what can change
- Layout options shown to you before approval
- Interior design and a 3D model of the changed spaces
- Updated architectural, structural and MEP sheets affected by the change
- Quantity take-off of the changed works on request
Pricing
Priced by the redesigned area at the published architectural and interior design rates. You receive a fixed quote within one working day after we review the drawings.
From our work


Send your current drawings
Send the drawings or site photos and we reply with options and a quote within one working day.
