Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Home / Special projects

Special projects

Elements outside a typical building that need careful design and detail: curved canopies and steel features, sculpture bases and anchorage, GRC facades and ornament, and sign structures. We model them in the right software and prepare fabrication and installation drawings for the workshop and the contractor.

What is included

  • A 3D model of the element in Advance Steel or Revit
  • Structural calculations for the element and its connections
  • Fabrication, connection and cutting-list sheets for the workshop
  • Installation, anchorage and level sheets for the contractor
  • A second engineer review before issue

Pricing

Each special project is priced by its scope. You receive a fixed quote within one working day after we review the brief.

Published prices

From our work

Curved steel canopy in Advance Steel
Curved steel canopy in Advance Steel
Connection detail from the canopy model
Connection detail from the canopy model
Statue on a base: shop drawings and anchorage
Statue on a base: shop drawings and anchorage

A special element in mind?

Send the idea, sketch or a reference photo and we reply with the scope and a quote within one working day.

Request a quote