Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy
Timber tiered seating with cushions in an office

Home / Interior design

Interior design

We design interiors for homes, palaces, offices and cafés. We plan the spaces, choose materials, finishes and lighting, and prepare 3D visuals and construction drawings. Our team can also build it on a turnkey basis.

Interior designPriced per: m²

Starting from · before VATSaudi riyal 150
Minimum orderSaudi riyal 12,000

Services

Interiors designed to be built

Space planning

Layout and furniture plans that respect use, circulation and privacy.

Materials & finishes

We put together material boards covering marble, timber, gypsum and gilding, and show samples before approval.

Ceilings & lighting

Ceiling and architectural lighting design, coordinated with electrical works.

3D visuals

You see every space as a realistic image before work starts.

Construction drawings

Construction drawings, details and finish schedules ready for pricing.

Turnkey execution

Our contracting team builds the design under engineering supervision and quality control.

Deliverables

Interior design documents

Visuals & material boards 3D images and material boards for every space.
Construction drawings DWG and PDF files with details and finish schedules.
Bill of quantities A priced BOQ for the design items on request.

From the team's experience

Related projects

All selected projects
Interiors Open-plan workspace in a corporate office Interior design proposal · Al-Khobar · 2026
Interiors Café with a curved timber ceiling and display walls Turnkey · Riyadh · 2025
Interiors Head office reception area Private client · Riyadh · 2026
Interiors Reception majlis in a head office Private client · Riyadh
Interiors Head office in a contemporary industrial style Private client · Riyadh · 2026
Finishing Marble and gilding in a palace interior Private client · Riyadh · 2023
:

3D villa tour from your plan

Facade, site plan, furnished rooms and approximate quantities from the same plan, on our own sample villa: Open the tour.

Frequently asked about this service

What does the interior design package include?

Furniture, ceiling, lighting and flooring plans, joinery details, a material and finishes schedule and 3D visualisations of the main spaces.

Can you build after the design?

Yes, on a turnkey basis, or we hand the package to a contractor of your choice and supervise execution.

How many revisions are included?

Two revision rounds at concept stage and one at construction stage are included; further revisions are charged hourly.

Do you work in both classical and contemporary styles?

Yes, from gypsum and classical ornament to contemporary industrial style, as shown in our projects.

Contact us

Discuss your project with us

Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Riyadh Site visits and project coordination
Working hours Sunday to Thursday, 9:00 to 18:00 Riyadh time
Contact card Save to contacts