Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Interiors · From the founding team’s experience

Interior design proposal for an Al-Khobar corporate office

Interior design proposal for a corporate office in Al-Khobar, 2026: open-plan workspace, feature walls and architectural lighting.

Open-plan workspace in a corporate office Interior design proposal · Al-Khobar · 2026
Feature walls and architectural lighting in a corporate office Interior design proposal · Al-Khobar · 2026

What interior design typically cover

  • Client brief and space planning.
  • Design concept, material and colour boards, and 3D visualisations.
  • Construction drawings for ceilings, floors, walls, lighting and built-in joinery.
  • Bills of quantities and specifications so contractor offers compare on one basis.
  • Design supervision during construction on request.

A general description of this type of work, not a detailed statement of this project’s scope.

Related services

:

Contact us

Discuss your project with us

Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Riyadh Site visits and project coordination
Working hours Sunday to Thursday, 9:00 to 18:00 Riyadh time
Contact card Save to contacts