Saudi Arabia · Egypt Client portal +966 59 700 9855 a.fathy@arabcreators.co
Arab Creators Engineering Consultancy

Home / Design concepts

Design concepts

Villas, majlis, courtyard houses and living spaces designed by us, each with its own page of large images and material details.

Architectural conceptAll of these are concepts designed by Arab Creators, not built projects. For projects where we did the study or the works see Selected projects.

Interior conceptPrivate residence · Riyadh · 2026

Formal Majlis

A formal majlis on a single axis: plaster arch, bronze-framed arched window, ivory bouclé seating, travertine and brass.

View the concept (4 images)

Interior conceptPrivate residence · Riyadh · 2026

Dressing Room

Walk-in dressing room: fluted oak wardrobes, bronze-framed glass, travertine island and an arched mirror.

View the concept (4 images)

Short reels

Videos of about 20 seconds with voice-over, one reel for each concept.

Stone and Timber Villa
Stone and Timber Villa
Contemporary Najdi Majlis
Courtyard House
Red Sea Coastal Villa

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost