Saudi Arabia · Egypt Client portal +966 59 700 9855 a.fathy@arabcreators.co
Arab Creators Engineering Consultancy

Interior conceptPrivate residence · Riyadh · 2026

Entrance Foyer with Double Stair

Double-height foyer with a symmetrical travertine double stair, bronze balustrade and blown-glass chandelier.

A concept designed by Arab Creators, not a built project.

Main view Entrance Foyer with Double Stair · Interior concept
Styled corner Entrance Foyer with Double Stair · Interior concept
Material detail Entrance Foyer with Double Stair · Interior concept
Room view Entrance Foyer with Double Stair · Interior concept

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: