Saudi Arabia · Egypt Client portal +966 59 700 9855 a.fathy@arabcreators.co
Arab Creators Engineering Consultancy

Architectural conceptPrivate residence · Riyadh · 2026

Contemporary Najdi Majlis

An Arab majlis with a contemporary spirit: hand-finished earth plaster walls, a white gypsum Najdi triangle frieze, a palm-trunk and palm-rib ceiling, and an arched window on the axis facing the palms.

A concept designed by Arab Creators, not a built project.

Majlis axis to the arched window Contemporary Najdi Majlis · Architectural concept
Seating run and Najdi frieze Contemporary Najdi Majlis · Architectural concept
Dallah, dates, window shadow Contemporary Najdi Majlis · Architectural concept

Materials and details

  • Hand-finished earth plaster walls
  • White gypsum Najdi triangle frieze
  • Palm-trunk beams with palm-rib infill
  • Arched window, slim timber frame

Video

A contemporary Najdi majlis

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: