Saudi Arabia · Egypt Client portal +966 59 700 9855 a.fathy@arabcreators.co
Arab Creators Engineering Consultancy

Architectural conceptPrivate residence · Yanbu · 2026

Red Sea Coastal Villa

A villa on the Red Sea coast at Yanbu: white lime render under a deep flat roof, low coral-stone walls, an oak-decked terrace, and native coastal planting with date palms.

A concept designed by Arab Creators, not a built project.

Sea-facing elevation, morning Red Sea Coastal Villa · Architectural concept
Blue hour Red Sea Coastal Villa · Architectural concept
Living room open to terrace and sea Red Sea Coastal Villa · Architectural concept

Materials and details

  • White lime render, deep flat roof
  • Low coral-stone walls
  • Oak terrace decking
  • Native coastal planting, date palms

Video

The Red Sea coastal villa

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: