Architectural conceptPrivate residence · Riyadh · 2026
Courtyard House
A house around an open courtyard in Riyadh: sand-textured plaster and limestone, lattice timber screens, a shallow water channel with olive trees, and slim-frame sliding glazing.
A concept designed by Arab Creators, not a built project.
Materials and details
- Sand-textured plaster, limestone
- Timber lattice screens
- Shallow water channel, olive trees
- Slim-frame sliding glazing
Video
More concepts
Want a concept for your project?
Send the drawing or site photos and we reply with a quote within one working day.
