Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy
Steel canopy structure under a concrete slab

Home / Expertise

Expertise

The founding team works in planning and scheduling, quantity surveying and pricing, tenders and contracts, procurement, and quality and safety. We produce the work inside the engineering software itself and hand over the native files.

Remote project follow-upPriced per: month

Starting from · before VATSaudi riyal 3,500
Minimum orderSaudi riyal 3,500

Planning & scheduling

Baseline and update programmes in Primavera P6

We build the programme in Primavera P6 itself and print it from there. You get an importable XER file plus PDF copies for approval.

Work breakdown structure

By package, discipline and location, with activity codes for filtering and reporting.

Site calendars

Saudi 6-day calendar (Sat-Thu) with National Day, Founding Day and both Eids set as holidays.

Critical path

Longest-path analysis, contract completion constraints and total-float review.

Resource & cost loading

Cost-loaded programmes from the BOQ, labour distribution and manpower histograms.

S-curve & progress

Planned-versus-actual curve, periodic updates and a weekly look-ahead of upcoming works.

Quality check

Logic and relationship check against the DCMA 14-point assessment before approval.

Programme deliverables

  • XER file for import into Primavera P6
  • A3 Gantt chart printed from P6
  • Milestone table and WBS summary
  • Basis of Schedule narrative
  • Excel tracking dashboard and S-curve

Programmes prepared by the team

Office building renovation, new multi-purpose hall and site works 9 months · 203 activities · critical path through the power connection
Design and construction of a fire station within a transport facility 12 months · 163 activities · cost-loaded
Turnkey residential villa 6 months · from the first item to key handover
Office fit-out including furniture 30 days · day-by-day works and supply schedule

See pages from a real programme printed from Primavera P6, with the project Revit model

Owner and project names are withheld for confidentiality; sample copies are shown on request.

Areas of expertise

What the team delivers alongside scheduling

Quantity surveying & pricing

  • Take-off from drawings with a dimension reference sheet
  • M+L+E rate build-up models with live formulas
  • Bid balancing and payment cash-flow models
  • Bid comparison sheets including VAT

Tenders & contracts

  • Government tenders on Etimad
  • Complete technical and financial offers
  • FIDIC contracts, particular conditions and insurance schedules
  • Payment schedules, retention and bonds

Procurement & subcontracting

  • Procurement plans linked to the programme
  • Long-lead items and order-by dates
  • Subcontract and supply agreements
  • Material submittal registers with Saudi-market alternatives

Quality & safety

  • Requests for information (RFI) and non-conformance reports (NCR)
  • Minutes of meeting, drawing and correspondence registers
  • Work inspection and acceptance forms
  • HSE plans with risk assessment and job safety analysis (JSA)

Sectors the team has worked in

From ports to palaces

  • Port facilities, inspection sheds and customs gates
  • Quantities, testing and commissioning for electrical & instrumentation works at gas facilities
  • Hospital finishing
  • Pricing studies for mixed-use urban developments
  • Office and administrative buildings
  • Villas, palaces and classical ornament
  • Industrial coating and rope-access works

Engineering software

Primavera P6 AutoCAD Revit Excel Word

Frequently asked about this service

Which software do you use?

Primavera P6 for programmes, AutoCAD and Revit for drawings and Excel for bills of quantities and pricing, delivering native files from each application.

Do you prepare delay analysis for claims?

Yes, delay analysis by recognised methods (such as time impact analysis) with notices and supporting records per the contract conditions.

Can the programme be updated monthly?

Yes, periodic updates with actual progress against baseline and a short management report.

Do you serve other contractors?

Yes. We work as a back-office technical team for contractors, handling take-off, pricing, programmes and technical proposals.

Contact us

Discuss your project with us

Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Riyadh Site visits and project coordination
Working hours Sunday to Thursday, 9:00 to 18:00 Riyadh time
Contact card Save to contacts