Concrete and steel structure design with calculation reports in ETABS and SAFE, connection design with IDEA StatiCa reports, Advance Steel fabrication drawings, and independent structural review.
HVAC, water supply and drainage, power, fire fighting and alarm, with load calculations and a combined services drawing.
Architectural design & 3D modelling
Concept and construction drawings, plus 3D visuals for presentation and approval.
Interior design
We plan the space and select materials and finishes, then produce 3D visuals and construction drawings for homes, offices and cafés.
Quantity take-off & BOQs
Measured from the drawings, with the drawing number and page noted against every item.
Estimating & rate analysis
We build each rate from materials, labour and equipment, then add indirect costs and profit. The formulas stay live in the file.
Tender support
We prepare the technical and financial offers and check the tender conditions and BOQ before submission, including bids on Etimad.
Design & drawing review
We pick up clashes between disciplines and check the drawings against the Saudi Building Code (SBC).
Contract administration & scheduling
FIDIC contract administration, variations and claims, and programmes built in Primavera P6.
Shop drawings & quantity take-off
Shop drawings for every discipline within 24-48 hours for villas and mid-size buildings, with quantity take-off and a priced BOQ. Service details