Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

What documents does an accurate quotation need?

An accurate quotation starts with the documents the estimator receives. Every missing detail becomes an assumption, and every assumption either adds risk margin to the price or opens the door to a dispute during construction.

· 2 min read · Arab Creators team

Open-plan offices after fit-out
From our team's work

These are the documents we ask for before preparing a scope and quotation, and how each one affects the result.

Drawings, latest revision

Architectural and structural drawings, plus MEP drawings if they are in scope, in PDF or DWG, with the revision schedule. Pricing from an out-of-date revision is one of the most common causes of quantity differences.

  • Send the complete set, not selected sheets, so references between sheets can be traced.
  • DWG files measure more accurately than scanned PDFs.
  • If there is more than one revision, state which one is to be priced.

Technical specification

The specification fixes what the drawings do not show: concrete grade, insulation type, tile class, and test and acceptance criteria. A single item such as “internal painting” can double in price from one specification to another.

Bill of quantities, if available

If the owner or consultant has a bill of quantities, we price it as issued, then check its quantities against the drawings and report any differences before submission, rather than changing it without a record.

Location, area and site conditions

  • Project location (city and district, or coordinates), it drives transport and labour costs.
  • Approximate area and number of floors.
  • Constraints: permitted working hours, equipment access, work inside an occupied building.

Scope and target date

State what the quotation includes and excludes: is MEP in scope? Is supply by the contractor or the owner? When is completion required? The date sets the team size, and so affects the price.

What you receive from us

A quotation built on clearly described items, with a list of assumptions, exclusions and any gaps we found in the documents, so that quotations can be compared on the same basis.

Contact us

Discuss your project with us

Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Riyadh Site visits and project coordination
Working hours Sunday to Thursday, 9:00 to 18:00 Riyadh time
Contact card Save to contacts