Industrial coating
We prepare surfaces and apply coating systems to structures, steelwork and industrial equipment to the project specification.

Home / Rope access & industrial coating
Our rope access teams, working to the IRATA system, coat, maintain, install, clean and inspect facades, structures and industrial equipment at height. Every task has its own safety plan and permit to work.
Services
We prepare surfaces and apply coating systems to structures, steelwork and industrial equipment to the project specification.
We clean glass and metal facades, replace sealant and repair cladding.
We install and replace cladding panels, glazing and signage where access is difficult.
We inspect facades and structures visually, photograph them and write a condition report.
No task at height starts until the method statement, risk assessment, permit to work and rescue plan are approved.
On many jobs it cuts set-up time and saves the cost of scaffolding and cranes.
Deliverables
Work at height
Rope access work is carried out to the IRATA system: two independent ropes per technician, a supervisor on site and an approved rescue plan.
Industrial & work at height
Our rope access teams, working to the IRATA system, carry out coating, maintenance, installation and inspection at height.

When a structure is hard to reach, our rope access teams get close enough to see it properly. We inspect at height without scaffolding or cranes, so the asset stays in service and the inspection is done in hours rather than days.
We work for industrial plants, ports and commercial building owners across Saudi Arabia, under the facility's permit-to-work system. See the port crane repainting project for an example of rope access work on site.
For short to medium-length work at height, or where scaffolding is hard to erect, such as on cranes, tanks and facades. Set-up time drops from days to hours.
Certified rope-access technicians at graded levels, a rescue plan and a qualified supervisor in every team, and equipment inspection before every shift.
Surface preparation to SSPC-SP 5/6/10 and the coating system per client specification and manufacturer data sheet, with dry-film thickness measured and recorded.
Yes, under permit-to-work, HCIS requirements and facility management rules, as on previous works inside a port facility.
Yes. Our teams carry out close visual inspection at height on facades, steel structures, cranes and tanks, with photos, coating thickness readings where required, and a written condition report.
Contact us
Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.