Standards and codes we work to
Our work is designed, executed and measured against stated references; the applicable specification is named in every bill-of-quantities item and material submittal. The list below shows the references we work to by project type. It does not imply certification by the issuing body except where explicitly stated.
National codes and owner requirements
- Saudi Building Code SBC 2024
- Parts 201 (general), 301 (structural), 303 (soils and foundations), 304 (concrete), 306 (steel structures), 401 (electrical), 501 (mechanical), 601 (energy), 801 (fire protection).
- Saudi Aramco specifications
- SAES-H series (such as SAES-H-001) for coating systems and corrosion protection.
- Royal Commission for Jubail and Yanbu (RCJY)
- Specifications and requirements for work inside the industrial cities.
- High Commission for Industrial Security (HCIS)
- Security and safety requirements for sensitive facilities.
- Civil Defence
- Fire-prevention and means-of-egress requirements for commercial and residential buildings.
- Government Tenders and Procurement Law
- Submission, evaluation and contracting procedures in public tenders.
Fire protection
- NFPA 13
- Automatic sprinkler systems.
- NFPA 30
- Flammable and combustible liquids.
- NFPA 72
- Fire alarm systems.
- NFPA 90A
- Air-conditioning and ventilating systems.
- NFPA 400
- Hazardous materials.
Concrete and materials
- ACI 318 / 301 / 350
- Reinforced-concrete design, specification and liquid-containing structures.
- ASTM
- Material test methods and acceptance.
- BS EN 206 / 1992
- Concrete and European structural design.
- BS EN 12944
- Corrosion protection of steel structures by paint systems.
- SSPC-SP 5 / 6 / 10
- Steel surface-preparation grades before coating.
Electrical and mechanical
- IEC 60364 / 61439
- Electrical installations and switchgear assemblies.
- IEEE 141 / 142 / 242 / 519
- Distribution, grounding, protection and power quality.
- ASHRAE 90.1
- Energy efficiency in buildings.
Management and contracts
- ISO 9001 / 14001 / 45001
- Quality, environmental and OH&S management systems: our procedures are built on their requirements.
- FIDIC 2017
- Conditions of contract: notices, claims and change management.
- PMBOK 7
- Project management.
- RICS NRM 1-3
- Rules of measurement.
- AACE 18R-97
- Estimate accuracy classification.
Where references conflict, the contract specification applies first, then the national code, then international references; the conflict is recorded in an RFI before execution.
Contact us
Discuss your project with us
Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.
Saudi Arabia: mobile & WhatsApp
+966 59 700 9855
Egypt: mobile & WhatsApp Business
+20 111 256 5999
Email
info@arabcreators.co
Riyadh
Site visits and project coordination
Working hours
Sunday to Thursday, 9:00 to 18:00 Riyadh time
Contact card
Save to contacts
