Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Standards and codes we work to

Our work is designed, executed and measured against stated references; the applicable specification is named in every bill-of-quantities item and material submittal. The list below shows the references we work to by project type. It does not imply certification by the issuing body except where explicitly stated.

National codes and owner requirements

Saudi Building Code SBC 2024
Parts 201 (general), 301 (structural), 303 (soils and foundations), 304 (concrete), 306 (steel structures), 401 (electrical), 501 (mechanical), 601 (energy), 801 (fire protection).
Saudi Aramco specifications
SAES-H series (such as SAES-H-001) for coating systems and corrosion protection.
Royal Commission for Jubail and Yanbu (RCJY)
Specifications and requirements for work inside the industrial cities.
High Commission for Industrial Security (HCIS)
Security and safety requirements for sensitive facilities.
Civil Defence
Fire-prevention and means-of-egress requirements for commercial and residential buildings.
Government Tenders and Procurement Law
Submission, evaluation and contracting procedures in public tenders.

Fire protection

NFPA 13
Automatic sprinkler systems.
NFPA 30
Flammable and combustible liquids.
NFPA 72
Fire alarm systems.
NFPA 90A
Air-conditioning and ventilating systems.
NFPA 400
Hazardous materials.

Concrete and materials

ACI 318 / 301 / 350
Reinforced-concrete design, specification and liquid-containing structures.
ASTM
Material test methods and acceptance.
BS EN 206 / 1992
Concrete and European structural design.
BS EN 12944
Corrosion protection of steel structures by paint systems.
SSPC-SP 5 / 6 / 10
Steel surface-preparation grades before coating.

Electrical and mechanical

IEC 60364 / 61439
Electrical installations and switchgear assemblies.
IEEE 141 / 142 / 242 / 519
Distribution, grounding, protection and power quality.
ASHRAE 90.1
Energy efficiency in buildings.

Management and contracts

ISO 9001 / 14001 / 45001
Quality, environmental and OH&S management systems: our procedures are built on their requirements.
FIDIC 2017
Conditions of contract: notices, claims and change management.
PMBOK 7
Project management.
RICS NRM 1-3
Rules of measurement.
AACE 18R-97
Estimate accuracy classification.

Where references conflict, the contract specification applies first, then the national code, then international references; the conflict is recorded in an RFI before execution.

Contact us

Discuss your project with us

Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Riyadh Site visits and project coordination
Working hours Sunday to Thursday, 9:00 to 18:00 Riyadh time
Contact card Save to contacts