Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy
Cafe fit-out with a curved timber ceiling

Engineering consultancy · Contracting · Saudi Arabia and Egypt

Arab Creators for Engineering ConsultancyFrom the first drawing to handover

We prepare shop drawings and quantity take-off for every discipline, and design, build and fit out with one team, for owners, contractors and consultants in Saudi Arabia and Egypt.

From our team’s work: a café interior, designed and built

Why clients choose us

Proven experience, published prices, one accountable team

About us
10+yearsfounding team experience in project management
800M+SARvalue of projects the team has worked on
50+projectsacross pricing, studies and delivery
24-48hourstypical turnaround for a villa shop drawing set
  • Free first consultation before any commitment
  • Published price and minimum order before we start
  • Independent check by a second engineer before delivery
  • NDA on request

Saudi Council of Engineers member · Egyptian Engineers Syndicate · Saudi Building Code (SBC) · AutoCAD · Revit · Primavera P6

Services and prices

Services with published prices

All prices and packages
Shop drawings: architectural, structural, MEPStarting fromSaudi riyal 165 / A1 sheetMinimum 1,500 SAR · before VATRequest a quotation
Tender quantity take-off, all disciplinesStarting fromSaudi riyal 90 / 100 m²Minimum 2,000 SAR · before VATRequest a quotation
Architectural designStarting fromSaudi riyal 35 / m²Minimum 15,000 SAR · before VATRequest a quotation
Interior designStarting fromSaudi riyal 150 / m²Minimum 12,000 SAR · before VATRequest a quotation
Structural design and calculationsStarting fromSaudi riyal 15 / m²Minimum 8,000 SAR · before VATRequest a quotation
HSE plan, small or medium projectStarting fromSaudi riyal 3,500 / planMinimum 3,500 SAR · before VATRequest a quotation

Fixed-price packagesGulf pricingShop drawing price guide 2026

Design concepts

Villas, majlis and courtyard houses designed by us. These are concepts, not built projects.

All concepts

Flagship service

Shop drawings & QTO for every discipline

Consultant-ready shop drawings and a quantity take-off linked to every sheet, prepared by our technical office in Cairo for projects in Saudi Arabia and Egypt.

Service details

We sign a non-disclosure agreement (NDA) on request, before we receive your files.

Clear prices

Estimate the cost of your service

Pick the services and enter the quantities. The estimated total appears at once, with VAT added for Saudi Arabia and Egypt, in SAR or in your country currency.

How we work

From sending the drawings to closing the comments

Our method in detail
01

Send your drawings

Tender or IFC drawings in PDF or DWG, by WhatsApp or through the request form.

02

Scope & quote

We review the drawings, confirm disciplines and sheet count, and send a fixed quote.

03

Drawings + QTO

A complete villa-size set typically within 24-48 hours, depending on size and drawing quality.

04

Consultant comments closed

We revise against consultant comments and reissue under a new revision number; two revision rounds are included.

FAQ

Questions and answers

Short answers before you get in touch.

What services does Arab Creators provide?

Three disciplines: engineering consultancy (architectural and interior design, structural design of concrete and steel structures with calculation reports and connection design, MEP design, quantity surveying, pricing, tender support, design review, contract management and occupational health & safety systems), contracting and project execution (structural works, turnkey fit-out, classical ornament and GRC, landscape, industrial coating and rope access), and advertising and media (visual identity, company profiles, digital marketing, websites and architectural photography).

How long do shop drawings and quantity take-off take?

A complete villa-size set typically within 24-48 hours, depending on size and drawing quality. For larger projects, the delivery schedule is set out in the quotation.

Where do you work?

We serve projects in Saudi Arabia and Egypt, and provide technical services remotely for projects in the UAE, Qatar, Kuwait, Bahrain and Oman. Our head office is in 15th of May City, Cairo, and we serve Riyadh projects with site visits and direct coordination.

What do you need to prepare an accurate quotation?

Drawings in PDF or DWG, the technical specification, a bill of quantities if one exists, the project location, the required scope and the target date. The more complete the documents, the fewer assumptions in the quotation.

Do you visit and inspect sites?

Yes, in Saudi Arabia and Egypt, with the visit scheduled by arrangement. Choose “Site visit and inspection” in the request form and give the city and a preferred date.

How do you build a price?

From three elements, materials, labour and equipment, to reach the direct cost, then indirect costs, then profit margin. Each element sits in its own cell with a live formula, and every quantity is linked to its drawing number and page.

:

Contact us

Discuss your project with us

Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999