Saudi Arabia · Egypt Client portal +966 59 700 9855 a.fathy@arabcreators.co
Arab Creators Group

Home / Engineering consultancy / Quantity takeoff and BOQ pricing

Quantity takeoff and BOQ pricing from drawings to sell price

We measure the project from the drawings in all disciplines, then price the BOQ with a clear cost build-up. You receive an Excel workbook with live formulas for tender, negotiation and internal review.

Tender quantity take-off (all disciplines)Priced per: 100 m²

Starting from · before VATSaudi riyal 90
Minimum orderSaudi riyal 2,000

Scope

What you receive

Takeoff of civil, architectural and MEP works
A BOQ arranged by trade and item number
Rate analysis for every item: materials, labour and equipment
Indirect costs and then profit added up to the sell price
Every quantity linked to its sheet and source
Any quantity or rate based on an estimate declared plainly
A summary by discipline and by floor
An Excel file with live formulas that you can edit

Prices

Published prices for this service

ServiceCodePrice (SAR)UnitMinimum
Tender quantity take-off (all disciplines)QTO-10090100 m²2,000
BOQ pricingBOQ-PR55100 m²1,500

Prices are before 15% VAT in Saudi Arabia and match our quote calculator. The final price is fixed in the quotation after we review the drawings.

From takeoff to price in one file

Combining takeoff and pricing protects you from transfer errors between two files. We build the quantity sheet first from the drawings, and the pricing sheet reads the quantities directly, so when a quantity changes the price follows without manual work.

The pricing follows a fixed order: materials, labour and equipment for each item, then the direct cost total, then an indirect cost percentage, then a profit percentage to reach the sell price.

Work begins with a review of the tender set to confirm it is complete. Before the takeoff we send you a list of missing drawings and conflicts between disciplines, because a quantity with no drawing behind it cannot be defended in negotiation. Each discipline is then taken off on its own sheet, linked to the summary sheet.

Transparent rates

We do not hand over a price without a basis. Each rate in the file is shown with its source, and any item for which we cannot find a documented rate is declared as an estimate, so you can decide whether to request a supplier quote. The summary highlights the highest value items to focus on in negotiation.

  • Quantities taken from the drawings and linked to sheets.
  • Review by an independent second engineer before delivery.
  • Main totals compared with per square metre indicators.

In pricing we break every item into its parts: material quantity per unit with a declared waste factor, labour output per hour or per day, and equipment hours. We add up the direct cost, then add indirect costs as a visible percentage and profit as a visible percentage, so you can change any percentage and see its effect on the total.

Who benefits

It suits the contractor preparing a bid at short notice, the owner who wants to test the offers received, and the consultant who needs an independent estimate. For villas, see villa quantity takeoff, and for finishing works finishes quantity takeoff.

Cost comparisons are in our article on shop drawing and takeoff prices in 2026, and our method is in quantity takeoff step by step.

Because the workbook has live formulas, you can test scenarios such as a different steel price or a substituted material, and the sell price recalculates. We recommend requesting supplier quotes for the highest value items, and the summary lists them so you know where to start.

Price

Quantity takeoff costs 90 SAR per 100 m2 of built-up area, minimum 2,000 SAR, and BOQ pricing costs 55 SAR per 100 m2, minimum 1,500 SAR, both before VAT. Worked example only, for a 5,000 m2 project: takeoff 50 x 90 = 4,500 SAR, pricing 50 x 55 = 2,750 SAR, total 7,250 SAR before VAT, plus 15% VAT in KSA.

The delivery date is fixed in the quote according to the project scope. The quantities and rates are for tender use; any drawings that accompany them are prepared for review, approval and stamping by your licensed engineer in the project country, and we do not stamp drawings.

To start, send the tender set and tell us the owner's submission date. We review the set free of charge and prepare a scope and area table, then send the quote with a fixed date. On large projects an initial summary can be delivered first, so you can begin requesting supplier quotes while we complete the remaining sheets, and the final file follows after the second review.

Before we start

What we need from you

The full tender set: architectural, structural and MEP
Specification and any original bill of quantities
Addenda and queries issued by the owner
Project location and expected duration
Any supplier or subcontractor prices you already hold

How it works

Four steps from drawings to delivery

01

Send your drawings

Send the IFC (issued for construction) or tender drawings.

02

Fixed quote

We review the drawings and send a fixed quote within 24 hours.

03

50% advance

Work starts as soon as the advance payment is received.

04

Delivery

Drawings are delivered for review; DWG files are released after final payment.

Frequently asked questions

Is pricing separate from the takeoff?

It is a service at 55 SAR per 100 m2. You can order it with our takeoff or on quantities you already hold.

What does the sell price include?

Materials, labour and equipment, then indirect costs and profit, each on its own visible line.

How are estimated rates declared?

Every rate carries its source, and items based on an estimate are declared as such.

How long does a large project take?

The date is fixed in the quote according to scope, area and number of disciplines.

Is the first consultation free?

Yes, and we sign an NDA on request.

Free sample sheet

Free sample sheet on your own project before any order

Send your project drawings on WhatsApp and we will prepare a free sample sheet, so you can judge the quality before you commit to an order.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Head office 15th of May City, Cairo
Riyadh Office being established
Working hours Sun to Thu · 9:00 am to 5:00 pm
Contact card Save to contacts