Home / Service packages
Engineering service packages
Pick the package that fits your project size at a price you know in advance. Prices come from our published 2026 price list and are before 15% VAT.
Architectural shop drawings
Plans, sections, elevations and construction details, ready for consultant submission.
| Package | Size or scope | Price | Request a quote |
|---|---|---|---|
| Basic | 10 A1 sheets | SAR 1,650before VAT | Order |
| Standard | 20 A1 sheets | SAR 3,300before VAT | Order |
| Advanced | 40 A1 sheets | SAR 6,600before VAT | Order |
Rate: Saudi riyal 165 / sheet (A1), minimum Saudi riyal 1,500
Structural shop drawings with BBS
Reinforcement drawings with bar bending schedules (BBS).
| Package | Size or scope | Price | Request a quote |
|---|---|---|---|
| Basic | 10 A1 sheets | SAR 1,950before VAT | Order |
| Standard | 20 A1 sheets | SAR 3,900before VAT | Order |
| Advanced | 40 A1 sheets | SAR 7,800before VAT | Order |
Rate: Saudi riyal 195 / sheet (A1), minimum Saudi riyal 1,500
Tender take-off, all disciplines
Excel BOQ with open formulas; every quantity referenced to its drawing.
| Package | Size or scope | Price | Request a quote |
|---|---|---|---|
| Basic | up to 2,200 m² | SAR 2,000before VAT | Order |
| Standard | up to 5,000 m² | SAR 4,500before VAT | Order |
| Advanced | up to 10,000 m² | SAR 9,000before VAT | Order |
Rate: Saudi riyal 90 / 100 m², minimum Saudi riyal 2,000
Photo-real 3D renders
Modelling, lighting and high-resolution output for an exterior or interior.
| Package | Size or scope | Price | Request a quote |
|---|---|---|---|
| Basic | 4 views | SAR 1,400before VAT | Order |
| Standard | 6 views | SAR 2,100before VAT | Order |
| Advanced | 10 views | SAR 3,500before VAT | Order |
Rate: Saudi riyal 350 / view, minimum Saudi riyal 1,400
Steel structure design
Sheds, warehouses, mezzanines, canopies and steel buildings, with calculation report and construction drawings.
| Package | Size or scope | Price | Request a quote |
|---|---|---|---|
| Basic | up to 600 m² | SAR 9,000before VAT | Order |
| Standard | up to 1,500 m² | SAR 22,500before VAT | Order |
| Advanced | up to 3,000 m² | SAR 45,000before VAT | Order |
Rate: 15 SAR/m², minimum 8,000. Connection design 400 SAR per connection type, minimum 2,000 SAR. Details on the structural design page.
Structural steel fabrication drawings
Advance Steel 3D model with fabrication and erection drawings and material and bolt lists.
| Package | Size or scope | Price | Request a quote |
|---|---|---|---|
| Basic | up to 20 tons | SAR 4,000before VAT | Order |
| Standard | up to 50 tons | SAR 10,000before VAT | Order |
| Advanced | up to 100 tons | SAR 20,000before VAT | Order |
Rate: 200 SAR per ton, minimum 2,500 SAR.
Full villa design
Architectural, structural and MEP in one offer. Drawings stamped for the building permit in Saudi Arabia go through a licensed Saudi engineering office.
| Package | Size or scope | Price | Request a quote |
|---|---|---|---|
| Basic | villa up to 400 m² | SAR 31,000before VAT | Order |
| Standard | villa up to 700 m² | SAR 45,500before VAT | Order |
| Advanced | villa up to 1,000 m² | SAR 65,000before VAT | Order |
Rate: architectural 35 + structural 15 + MEP 15 SAR/m², with each discipline minimum. See villa design cost 2026.
Full interior design
Concept, furniture layout, 3D renders, construction drawings and finish schedules.
| Package | Size or scope | Price | Request a quote |
|---|---|---|---|
| Basic | up to 100 m² | SAR 15,000before VAT | Order |
| Standard | up to 200 m² | SAR 30,000before VAT | Order |
| Advanced | up to 400 m² | SAR 60,000before VAT | Order |
Rate: 150 SAR/m², minimum 12,000 SAR.
Survey and laser scanning
Field work in Saudi Arabia by a GEOSA-licensed survey office; drafting and modelling by us, remotely. Service details and samples.
| Package | Size or scope | Price | Request a quote |
|---|---|---|---|
| 3D laser scanning of existing buildings | Registered point cloud in E57 and RCP with panoramas. Minimum SAR 12,000, Saudi Arabia only. | SAR 8per m², excl. VAT | Request this service |
| As-built drawings from a point cloud | Plans, levels, sections and internal elevations in DWG and PDF. Minimum SAR 3,000, remote. | SAR 3per m², excl. VAT | Request this service |
| Scan-to-BIM Revit model, LOD 200 | Model ready for coordination and clash detection; LOD 300 at SAR 9 per m². Minimum SAR 5,000. | SAR 5per m², excl. VAT | Request this service |
| Land survey up to 1,000 m² | Boundaries, spot levels, contours and a design-ready CAD plan by a licensed office. Large sites SAR 3,800 per hectare. | SAR 1,600per plot, excl. VAT | Request this service |
| Cut and fill volumes from survey data | Sections and a quantity table from survey data up to one hectare, remote. | SAR 950per site, excl. VAT | Request this service |
| Survey data check against drawings | Up to 200 points checked against the design drawings with a comments report, remote. | SAR 1,200per submission, excl. VAT | Request this service |
How to order
- Pick a package and press Order; a WhatsApp message opens with the package code.
- Send your drawings in PDF or DWG and we confirm the scope and delivery date.
- Pay by bank transfer or payment link and receive a tax invoice.
- Project bigger than the packages? Use the quote calculator or request a quotation.
Frequently asked questions
Do prices include VAT?
No. 15% VAT is added in Saudi Arabia. In Egypt prices are in Egyptian pounds with 10% schedule tax.
How long is delivery?
Delivery time is set when we confirm the order after reviewing the drawings, and it is written in the confirmation before payment.
Which package do I need?
Send your drawings on WhatsApp and we recommend one, or request the free quantity take-off of one sheet, delivered within two days, on the contact page.
Read also: Shop drawing and quantity take-off prices 2026.
