Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy
Vertical timber slat partitions in an office

Home / Free services

Free services

Free ways to start your project with us at no cost and no obligation, plus working templates to download.

Free services

Free take-off of one sheetSend one drawing sheet and get a free quantity take-off, delivered within two days. One sheet per client, quantities only.Send one sheet
Instant quote calculatorEstimate your service cost in seconds and send it on WhatsApp.Calculate now
Complete template packs172 bilingual forms: QC, method statements and HR.See the packs
Fixed-price service packagesShop drawings, take-off, renders, follow-up and HSE plans: pick a package at a known price.See the packages
Free 30-minute consultation A phone or WhatsApp call to discuss your project scope and options before any quotation. Book the call

Direct download

Free templates to download

Templates we use in our own work, ready to edit and use on your projects, no sign-up.

Bar bending schedule (BBS) template Excel with live formulas and Arabic and English headers: cut length with bend deductions, unit weight d²/162, weight per bar mark and a weight summary by diameter in tonnes.
Download (XLSX · 34 KB)
Quantity take-off sample: residential villa Excel with live formulas: the take-off schedule, dimension sheet, bar bending schedule and HVAC and sprinkler calculations, matching the shop drawing sample set.
Download (XLSX · 36 KB)
Unit rate build-up & BOQ template Excel with live formulas: materials + labour + equipment, then indirect costs and profit, with a dimensions reference sheet (Arabic).
Download (XLSX · 15 KB)
Quotation documents checklist Printable PDF: everything an estimator needs for an accurate quotation (Arabic).
Download (PDF · 177 KB)
Weekly site HSE inspection checklist Printable PDF: weekly site inspection items with corrective actions (Arabic).
Download (PDF · 222 KB)
Snag list register Excel with live formulas: a numbered defects register with priority, responsibility and due date, and an automatic summary of open, closed and overdue items (bilingual).
Download (XLSX · 20 KB)
Request for Information (RFI) form Bilingual Word form: request details, drawing reference, query, proposed solution, cost and time impact, response and closure.
Download (DOCX · 11 KB)
Site visit report Bilingual Word form: purpose, works in progress and percent complete, labour and equipment, quality and safety observations, actions required.
Download (DOCX · 11 KB)

Free services carry no obligation to contract; what you send is used only to answer your request, as set out in the privacy notice.

Contact us

Discuss your project with us

Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Riyadh Site visits and project coordination
Working hours Sunday to Thursday, 9:00 to 18:00 Riyadh time
Contact card Save to contacts