Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy
Villa pool and timber deck design

Home / Architectural design

Architectural design

We design homes, palaces, and commercial and office buildings, from concept and schematic design through to construction drawings and 3D visuals. Our drawings are coordinated with the structural and MEP disciplines.

Architectural designPriced per: m²

Starting from · before VATSaudi riyal 35
Minimum orderSaudi riyal 15,000

Services

From concept to construction drawings

Concept design

We study the site and the brief, sketch layout and massing options, and get the concept approved before we start detailing.

Detailed architectural drawings

Plans, elevations and sections, with door, window and finish schedules.

Facades & styles

Contemporary and classical facades, with stone, GRC and ornament details.

3D modelling

We build the architectural model in Revit and render 3D visuals from it for presentation and approval.

Discipline coordination

We coordinate the drawings with structural and MEP and resolve clashes on paper, before construction.

Construction drawing package

Construction drawings ready for pricing and execution, with bills of quantities on request.

Deliverables

Architectural design documents

Drawings DWG and PDF files with revision numbering.
Model & visuals Revit model and high-resolution 3D images.
Schedules Finish, door and window schedules, and a priced BOQ on request.

From the team's experience

Related projects

All selected projects
Ornament & facades Classical palace with central dome Architectural works · Riyadh · 2023
Design & 3D visualisation Dangerous-goods inspection shed, 3D visualisation 3D visualisation · Jazan · 2026
Ornament & facades Classical ornament in gypsum and GRC Private palace · Riyadh · 2024
:

3D villa tour from your plan

Facade, site plan, furnished rooms and approximate quantities from the same plan, on our own sample villa: Open the tour.

Frequently asked about this service

What are your architectural design stages?

Brief, concept design, developed design, then construction drawings and details, with written approval at the end of each stage.

Does the service include authority approvals?

Drawings are prepared to the Saudi Building Code and municipality and Civil Defence requirements. A licensed engineering office in the Kingdom stamps and submits through the Balady platform where required.

How long do complete villa drawings take?

Six to ten weeks for architectural and structural construction drawings of a 400-600 m² villa, depending on approval speed.

Do I receive editable files?

Yes. You get DWG and Revit files alongside PDF, as stated in the agreement.

Contact us

Discuss your project with us

Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Riyadh Site visits and project coordination
Working hours Sunday to Thursday, 9:00 to 18:00 Riyadh time
Contact card Save to contacts