Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Villa design cost in 2026: architectural, structural and MEP

A villa design is not one drawing but at least three disciplines: architectural, structural and MEP. These are our 2026 prices and worked examples for two common sizes.

· 3 min read · Arab Creators team

3D render of a villa with pool and garden
From our team's work

Prices per m²

From our published 2026 price list, the same as in the quote calculator, before 15% VAT. Each discipline's minimum applies when the area result is lower.

ServicePrice (SAR)UnitMinimum
Full architectural design35m²15,000
Structural design and calculations15m²8,000
MEP design, all systems15m²8,000
Full interior design150m²12,000
3D render350view1,400

Worked examples

  • 400 m² villa: architectural 400 × 35 = 14,000, so the 15,000 minimum applies; structural 8,000; MEP 8,000. Total 31,000 SAR, with VAT 35,650 SAR.
  • 700 m² villa: architectural 24,500, structural 10,500, MEP 10,500. Total 45,500 SAR, with VAT 52,325 SAR.
  • Adding interior design to the 700 m² villa: 700 × 150 = 105,000 SAR before VAT.

The examples are arithmetic from the price list. The final price is confirmed in the quotation after reviewing the brief and the site.

What each discipline includes

  • Architectural: space planning, plans, elevations, sections and architectural details.
  • Structural: the structural system, calculation report, and foundation, column and slab drawings.
  • MEP: power and lighting, water supply and drainage, HVAC and fire requirements.

Permits and stamping

In Saudi Arabia we provide the technical work remotely. Stamped drawings required by the authorities for a building permit go through a licensed Saudi engineering office. Ask about this arrangement when you request a quote.

Payment terms

30% in advance, 30% on approval of the concept design, 30% on delivery of the detailed design and 10% on final handover, per the price list terms.

For renders and interior design see interior design and 3D render prices.

Estimate your villa design

Frequently asked questions

What does a 400 m² villa design cost?

Architectural 15,000 SAR (the minimum), structural 8,000 and MEP 8,000, a total of 31,000 SAR, or 35,650 SAR including 15% VAT.

What is the architectural design rate per m²?

35 SAR per m² before VAT, with a 15,000 SAR minimum per project.

Do you stamp drawings for the building permit?

We provide the technical work remotely; drawings stamped for the authorities in Saudi Arabia go through a licensed Saudi engineering office.

Contact us

Discuss your project with us

Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Working hours Sunday to Thursday, 9:00 to 18:00 Riyadh time
Contact card Save to contacts