Prices in Saudi riyals
These come from our published price list, the same one used in the quote calculator. VAT of 15% is added in Saudi Arabia; in Egypt prices are in Egyptian pounds with 10% schedule tax.
| Service | Code | Price (SAR) | Unit | Minimum order |
|---|---|---|---|---|
| Interior design (concept, 3D, IFC drawings) | ENG-INT | 150 | m² | 12,000 |
| Photo-real 3D render | ENG-3D | 350 | view | 1,400 |
What interior design includes
Full interior design runs in three stages: the concept and space planning, then 3D renders of the main spaces, then the construction drawings the contractor builds from. The price is per m² of the designed spaces.
Worked examples
- 180 m² apartment: 180 × 150 = 27,000 SAR. With VAT: 31,050 SAR.
- 450 m² villa: 450 × 150 = 67,500 SAR. With VAT: 77,625 SAR.
- 60 m² office: 60 × 150 = 9,000 SAR, below the minimum, so 12,000 SAR applies. With VAT: 13,800 SAR.
- 6 render views: 6 × 350 = 2,100 SAR. With VAT: 2,415 SAR.
- Only 2 views: 2 × 350 = 700 SAR, so the 1,400 SAR minimum applies. With VAT: 1,610 SAR.
The examples are arithmetic from the price list. The final price is confirmed in the quotation after reviewing the drawings and scope.
What sets the cost
- The area of the spaces to be designed, not the plot area.
- The number of render views, and whether they are interiors or exteriors.
- Whether accurate architectural drawings exist; without them a measured survey comes first.
- The level of construction detail needed for ceilings, floors, joinery and lighting.
How to keep the cost down
- Prepare reference images of the style you like before the concept starts.
- Order renders for the main spaces only and use drawings for the rest.
- Order the design and the construction drawings together to avoid rework on site.
For the stages after design see interior fit-out stages; for renders at a fixed price see our service packages.
Estimate your project now
Enter the area or the number of views in the quote calculator to see the estimated cost with VAT instantly.
Frequently asked questions
What does interior design cost per m² in 2026?
Our full interior design is 150 SAR per m² before VAT, with a 12,000 SAR minimum per project.
What does a 180 m² apartment design cost?
180 × 150 = 27,000 SAR, or 31,050 SAR including 15% VAT.
What is the price of a 3D render view?
350 SAR per view before VAT, with a 1,400 SAR minimum order. Six views cost 2,100 SAR, or 2,415 SAR with VAT.
Is the price final?
Prices are estimates from the published price list; the final price is confirmed in the quotation after reviewing the drawings and scope.