An interior fit-out succeeds or fails on sequence: any stage that starts before the one before it is complete comes back as lost time and money.

· 2 min read · Arab Creators team

Office corridor with glass walls and concrete columns
Photo: Mia Baker / Unsplash

These are the stages of an interior fit-out as we plan them on offices, restaurants, cafés and villas.

1. Site handover and survey

A measured survey of the actual site compared with the drawings, photographs of the existing floors, walls, ceilings and service points, and a signed site handover record that fixes the condition before work starts.

2. Construction drawings and approvals

Design sign-off, then shop drawings for ceilings, floors, walls and joinery coordinated with the MEP drawings, and approvals from the relevant authorities where needed, such as the municipality, civil defence, or the building or mall management.

3. Samples and material approval

Material submittals with samples and data sheets approved before purchase, and early ordering of long-lead items such as imported marble, made-to-order furniture and special light fittings, so work does not stop waiting for them.

4. First works

  • Demolition and strip-out if needed, then partitions.
  • MEP first fix.
  • Waterproofing in wet areas, with a flood test before it is covered.

5. Ceilings, walls and floors

Suspended ceilings with access panels, then wall preparation, then flooring, in a sequence that protects completed work from damage by later trades, with the final coat of paint among the last activities.

6. Joinery and second fix

Installation of factory-made joinery, doors and glazed screens, then the second fix of lighting, switches and equipment, followed by testing and commissioning.

7. Snagging and handover

A joint walk-through with the owner or consultant to prepare the snag list and close it item by item, then handover with as-built drawings, operation and maintenance manuals and warranty certificates.

Three rules: nothing is covered before it is tested, nothing is bought before the sample is approved, and nothing is handed over before the snag list is closed.

Where MEP works are outside the fit-out contractor’s scope, the contract should state clearly who coordinates between the contractors and when each stage is handed over.

Contact us

Discuss your project with us

Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Head office 15th of May City, Cairo
Riyadh Office being established
Working hours Sun – Thu · 9:00 am – 5:00 pm
Contact card Save to contacts