Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy
Diya Al-Tameer identity stationery

Home / Advertising & media

Advertising & media

We design visual identities, company profiles and digital content, particularly for contractors and engineering firms, and we work to the same precision we hold on site.

Advertising and media

PricingPrice depends on the scope of work

Services

What we do

Visual identity

Logo, colour and type system, and a usage guide in open formats.

Company profiles & print

Company profile, business cards, stationery and display banners in print-ready sizes.

Digital marketing

We plan content, schedule posts and run your social accounts.

Advertising campaigns

We run campaigns for companies and their openings, and measure the results.

Websites

We build fast bilingual company websites that work well on mobile.

Architectural photography

We photograph projects during construction and at handover.

Project signboards and signage

Project signboards for contractors and government owners: design, 3D visuals, shop drawings and structural wind and foundation calculations.

Deliverables

What you get

Open files Editable AI, INDD and PSD.
Brand guidelines Usage rules, colours and typefaces.
Monthly content calendar Scheduled posts featuring project photography.

Our work

Government project signboard in the Eastern Province

Project details

We designed the whole project signboard: identity on both faces, day and night 3D visuals, a site montage, shop drawings, and wind and foundation design in ETABS and SAFE, with solar lighting that needs no power cabling.

Two 3D views of a project signboard on two steel posts, by day and at dusk
The signboard by day and at dusk 3D visual · 3ds Max and V-Ray
Project signboard design of six panels: project title, owner, consultant, contractor, project data and safety strip
Graphic design of both faces Owner, consultant and contractor identity

Identity story

From the idea to every touchpoint

A good identity does not stop at the logo. We start from the company and what it needs, draw the mark, then apply it to everything the client sees: stationery, business cards, company profile, social media and website, with print-ready files.

01 IdeaUnderstand the business, its market and what the identity must say.
02 MarkThe logo in Arabic and English versions, colours, typefaces and usage rules.
03 ApplicationEvery touchpoint: print, company profile, social media and website.
Diya Al-Tameer, Riyadh
Diya Al-Tameer, RiyadhDiya Al-Tameer, Riyadh

Diya Al-Tameer, Riyadh

A full launch kit for a contracting company: logo, identity guide, 23-page company profile, social media kit, website and official stationery.

View the project
Arab Creators (our own identity)
Arab Creators (our own identity)Arab Creators (our own identity)

Arab Creators (our own identity)

One system for three divisions: letterheads, cards, envelopes, folders, roll-ups and 12 official templates, each division in its own colour.

View the project

Business services company, Jubail

The original logo existed only as a low-resolution image, so we redrew it as a vector without changing its shape or colours, then built 6 official print items on it.

View the project

Before and after campaigns for contractors

A contractor's strongest ad: one photo before, one after

We design before and after campaigns for contractors and fit-out companies: the site before work next to the finished result, with a short headline, a clear offer and a tracking code so the contractor knows which platform brought each client.

  • Real photos from your project, not stock images
  • A headline of five words or fewer
  • A clear offer, such as a free trial or a free consultation
  • A tracking code per platform to measure results
Request a campaign
Shop drawing of a project signboard
Shop drawing
3D visualisation of the same signboard at dusk
3D visualisation

Frequently asked about this service

What does the brand identity package include?

Logo in all formats and sizes, colour and type system, stationery, proposal and document templates and a short usage guide, all in editable files.

Do you photograph projects on site?

Yes, architectural photography of completed projects for profiles, websites and social media.

Do you build websites?

Yes, fast bilingual corporate websites optimised for search engines, like this one.

How are advertising campaigns priced?

A fixed monthly management fee plus the media budget, paid to the platforms directly and documented in reports.

Contact us

Discuss your project with us

Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Riyadh Site visits and project coordination
Working hours Sunday to Thursday, 9:00 to 18:00 Riyadh time
Contact card Save to contacts