Advertising · Project signboards
Project signboard: design, 3D visuals and structural calculations
Double-faced 3 x 3.4 m project signboard: face design, 3D visuals, shop drawings, wind and foundation design in ETABS and SAFE, and solar lighting.
What we deliver for project signboards
- Graphic design of both faces with the owner, consultant and contractor identity, to the owner requirements.
- Day and night 3D visuals and a montage on the site photo before fabrication.
- Full shop drawings: elevations, sections, steel details, foundations and bar bending schedule.
- Wind load calculation and design of the posts and footings in ETABS and SAFE, with a calculation note.
- Bill of quantities and material specifications: aluminium composite panels, print and solar lighting.
- Fabrication and installation through approved contractors on request.
The design and calculations were carried out for this signboard; the list describes what we provide for every project signboard.
Related services
Contact us
Discuss your project with us
Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.
Saudi Arabia: mobile & WhatsApp
+966 59 700 9855
Egypt: mobile & WhatsApp Business
+20 111 256 5999
Email
info@arabcreators.co
Working hours
Sunday to Thursday, 9:00 to 18:00 Riyadh time
Contact card
Save to contacts



