Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Structure · From the founding team’s experience

Villa structural works: curved stair, raft and slabs

Photos from villa structural works: a cast-in-place curved concrete stair, raft reinforcement before the pour, and slab reinforcement with the concrete pump.

Curved concrete stair rising to the slab opening Concrete frame stage
Raft reinforcement before the pour Foundation stage
Slab reinforcement with the concrete pump ready to pour Concrete frame stage · Riyadh

What structural works typically cover

  • Review of structural drawings and bar-bending schedules before start, raising any conflict as an RFI.
  • Formwork, reinforcement and pouring to the approved drawings and Saudi Building Code SBC 304.
  • Concrete quality control: slump tests, standard cube sampling and tracking of results.
  • Structural steel: shop drawings, connections and corrosion protection to specification.
  • Stage-by-stage inspection with the consultant, each stage recorded in a signed inspection report.

A general description of this type of work, not a detailed statement of this project’s scope.

Related services

:

Contact us

Discuss your project with us

Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Riyadh Site visits and project coordination
Working hours Sunday to Thursday, 9:00 to 18:00 Riyadh time
Contact card Save to contacts