Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Industrial & rope access · From the founding team’s experience

Port crane repainting by rope access

Repainting of port cranes by rope access in Jazan: surface preparation and coating application at height without scaffolding.

Port crane repainting by rope access Industrial facility · Jazan

What industrial works & rope access typically cover

  • A work plan, risk assessment, rescue plan and work-at-height permit for every task.
  • Certified technicians on an independent two-rope system under a certified supervisor.
  • Surface preparation to the project specification (SSPC cleanliness grades) before coating.
  • Coating system applied coat by coat with dry film thickness (DFT) checks on each coat.
  • Daily photo records and a close-out report of the works executed and measurements.

A general description of this type of work, not a detailed statement of this project’s scope.

Related services

:

Contact us

Discuss your project with us

Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Riyadh Site visits and project coordination
Working hours Sunday to Thursday, 9:00 to 18:00 Riyadh time
Contact card Save to contacts