Structure · From the founding team’s experience
Concrete frame for a multi-storey tower
Reinforced-concrete frame of a multi-storey tower for a private developer in Riyadh, 2026.
What structural works typically cover
- Review of structural drawings and bar-bending schedules before start, raising any conflict as an RFI.
- Formwork, reinforcement and pouring to the approved drawings and Saudi Building Code SBC 304.
- Concrete quality control: slump tests, standard cube sampling and tracking of results.
- Structural steel: shop drawings, connections and corrosion protection to specification.
- Stage-by-stage inspection with the consultant, each stage recorded in a signed inspection report.
A general description of this type of work, not a detailed statement of this project’s scope.
Related services
Contact us
Discuss your project with us
Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.
Saudi Arabia: mobile & WhatsApp
+966 59 700 9855
Egypt: mobile & WhatsApp Business
+20 111 256 5999
Email
info@arabcreators.co
Riyadh
Site visits and project coordination
Working hours
Sunday to Thursday, 9:00 to 18:00 Riyadh time
Contact card
Save to contacts



