What we deliver remotely
- Architectural and structural shop drawings with BBS, and coordinated MEP shop drawings.
- Tender quantity take-off for all disciplines and BOQ pricing.
- Architectural, structural and MEP design for villas and buildings, interior design and photo-real 3D renders.
- Project HSE plans and remote project follow-up.
Prices in your currency
Prices are before any local tax, converted from our SAR price list at the fixed rates of the dollar-pegged currencies and an estimated rate for the Kuwaiti dinar. For an exact figure for your project use the quote calculator and choose your country.
UAE
- Architectural shop drawings162 AED/ sheet (A1)
- Structural shop drawings with BBS191 AED/ sheet (A1)
- Coordinated MEP shop drawings171 AED/ sheet (A1)
- Tender quantity take-off (all disciplines)88 AED/ 100 m²
- BOQ pricing54 AED/ 100 m²
- Photo-real 3D render343 AED/ view
Calculate in AEDQatar
- Architectural shop drawings160 QAR/ sheet (A1)
- Structural shop drawings with BBS189 QAR/ sheet (A1)
- Coordinated MEP shop drawings170 QAR/ sheet (A1)
- Tender quantity take-off (all disciplines)87 QAR/ 100 m²
- BOQ pricing53 QAR/ 100 m²
- Photo-real 3D render340 QAR/ view
Calculate in QARKuwait
- Architectural shop drawings13.6 KWD/ sheet (A1)
- Structural shop drawings with BBS16.0 KWD/ sheet (A1)
- Coordinated MEP shop drawings14.4 KWD/ sheet (A1)
- Tender quantity take-off (all disciplines)7.4 KWD/ 100 m²
- BOQ pricing4.5 KWD/ 100 m²
- Photo-real 3D render28.8 KWD/ view
Calculate in KWDBahrain
- Architectural shop drawings16.5 BHD/ sheet (A1)
- Structural shop drawings with BBS19.6 BHD/ sheet (A1)
- Coordinated MEP shop drawings17.6 BHD/ sheet (A1)
- Tender quantity take-off (all disciplines)9.0 BHD/ 100 m²
- BOQ pricing5.5 BHD/ 100 m²
- Photo-real 3D render35.1 BHD/ view
Calculate in BHDOman
- Architectural shop drawings16.9 OMR/ sheet (A1)
- Structural shop drawings with BBS20.0 OMR/ sheet (A1)
- Coordinated MEP shop drawings17.9 OMR/ sheet (A1)
- Tender quantity take-off (all disciplines)9.2 OMR/ 100 m²
- BOQ pricing5.6 OMR/ 100 m²
- Photo-real 3D render35.9 OMR/ view
Calculate in OMR
The full table, all services and currencies
| Service | Unit | SAR | AED | QAR | KWD | BHD | OMR |
|---|
| Architectural shop drawings | sheet (A1) | 165 | 162 | 160 | 13.6 | 16.5 | 16.9 |
| Structural shop drawings with BBS | sheet (A1) | 195 | 191 | 189 | 16.0 | 19.6 | 20.0 |
| Coordinated MEP shop drawings | sheet (A1) | 175 | 171 | 170 | 14.4 | 17.6 | 17.9 |
| Tender quantity take-off (all disciplines) | 100 m² | 90 | 88 | 87 | 7.4 | 9.0 | 9.2 |
| BOQ pricing | 100 m² | 55 | 54 | 53 | 4.5 | 5.5 | 5.6 |
| Photo-real 3D render | view | 350 | 343 | 340 | 28.8 | 35.1 | 35.9 |
| Interior design (concept, 3D, IFC) | m² | 150 | 147 | 146 | 12.3 | 15.0 | 15.4 |
| Remote project follow-up | month | 3,500 | 3,428 | 3,397 | 288 | 351 | 359 |
| HSE plan, small or medium project | plan | 3,500 | 3,428 | 3,397 | 288 | 351 | 359 |
| Full HSE plan, large project | plan | 7,500 | 7,345 | 7,280 | 617 | 752 | 769 |
| Architectural design | m² | 35 | 34 | 34 | 2.9 | 3.5 | 3.6 |
| Structural design and calculations | m² | 15 | 15 | 15 | 1.2 | 1.5 | 1.5 |
| MEP design | m² | 15 | 15 | 15 | 1.2 | 1.5 | 1.5 |
| Steel structure design with calculations | m² | 15 | 15 | 15 | 1.2 | 1.5 | 1.5 |
| Steel connection design (IDEA StatiCa) | connection type | 400 | 392 | 388 | 32.9 | 40.1 | 41.0 |
| Steel fabrication drawings and 3D model | ton | 200 | 196 | 194 | 16.5 | 20.1 | 20.5 |
| Independent structural review | m² | 4 | 4 | 4 | 0.3 | 0.4 | 0.4 |
The minimum order for each service applies as shown in our service packages.
How it works
- Send your drawings in PDF or DWG on WhatsApp or through the request form.
- We send the scope, quotation and delivery date.
- We deliver the files electronically and answer consultant comments within the scope.
Important notes
- We provide technical services remotely. Drawings that need an official stamp in the project's country go through an office or contractor licensed there.
- We follow your project consultant's requirements and specifications.
- Prices exclude surveys, soil reports and authority fees.
Frequently asked questions
Do you work on projects in the UAE, Qatar and Kuwait?
Yes. We provide technical services remotely for projects in the Gulf: shop drawings, take-off, BOQ pricing, renders and HSE plans, with drawings received and files delivered electronically.
Which currency are prices in?
Our price list is in Saudi riyals and we show it in AED, QAR, KWD, BHD and OMR. The calculator shows the total in your country's currency.
Do prices include tax?
Prices shown for the Gulf countries are before any local tax. In Saudi Arabia 15% VAT is added.
Do you stamp drawings for the authorities?
No. Drawings that need an official stamp in the project's country go through an office or contractor licensed there; we prepare the technical work.
Estimate your project WhatsApp