Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Home / Engineering consultancy / Structural design

Structural and steel structure design

From foundations to complex steel structures: structural design with reviewable calculation reports, analysis models, construction drawings and fabrication drawings for structural steel.

Structural design and calculationsPriced per: m²

Starting from · before VATSaudi riyal 15
Minimum orderSaudi riyal 8,000

Concrete buildings

  • Concrete frame design for villas, palaces, residential and commercial buildings and towers.
  • Modelling and analysis in ETABS; slab, foundation and raft design in SAFE.
  • A full calculation report: loads, combinations, analysis and member design, to the Saudi Building Code SBC, the Egyptian code or the code set by the consultant.
  • Construction drawings for foundations, columns, beams, slabs and stairs, with bar bending schedules.

Steel structures

  • Design of sheds, warehouses and steel buildings, mezzanines, canopies, and special and curved steel structures.
  • Steel connection design with IDEA StatiCa reports: beam and column connections, base plates and moment connections.
  • Advance Steel 3D models with fabrication and erection drawings, material and bolt lists.
  • Design tied to fabrication: cut sizes and weld and bolt details ready for the workshop.

Independent structural review

Review of calculation reports and structural drawings prepared by others: loads, modelling, design and code compliance, with a written comments report. Suited to owners, developers and contractors before approval or construction.

Prices

Fixed prices from our 2026 price list before VAT. Estimate your project in the quote calculator.

ServicePrice (SAR)UnitMinimum
Structural design and calculations15m²8,000
Steel structure design with calculations15m²8,000
Steel connection design (IDEA StatiCa)400connection type2,000
Steel fabrication drawings and 3D model200ton2,500
Structural shop drawings with BBS195sheet (A1)1,500
Independent structural review4m²5,000

Licensing note

We provide the technical work remotely. Drawings and reports that need an official stamp in the project's country go through an engineering office licensed there.

Frequently asked questions

Do you design complex steel structures?

Yes: sheds, steel buildings, mezzanines, curved canopies and special structures, with connection design in IDEA StatiCa reports, Advance Steel models and fabrication drawings.

Which software do you use for structural design?

ETABS for modelling and analysis, SAFE for slabs and foundations, IDEA StatiCa for steel connections, Advance Steel for models and fabrication drawings, and AutoCAD and Revit for drawings.

What does structural design cost?

Concrete building design is 15 SAR per m² with an 8,000 SAR minimum, steel structures 15 SAR per m² with an 8,000 minimum, connections 400 SAR per connection type, minimum 2,000 SAR, and fabrication drawings 200 SAR per ton, before VAT.

Do you review a structural design by another office?

Yes, an independent structural review of calculations and drawings with a written comments report, at 4 SAR per m² with a 5,000 SAR minimum.

How much does steel detailing cost per ton?

Steel fabrication drawings with the 3D model are 200 SAR per ton, with a minimum of 2,500 SAR, before VAT.