Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Shop drawings & modelling · From the founding team’s experience

Curved steel canopy: 3D model and fabrication shop drawings

Advance Steel 3D model of a curved steel canopy for fabrication shop drawings: curved built-up beams, purlins, columns and bolted connections.

Bolted plate connection between the curved beam and column 3D model · Advance Steel
Full model: two curved beams, purlins and columns 3D model · Advance Steel

What steel shop drawings & modelling typically cover

  • A 3D model of the steel structure in Autodesk Advance Steel, built from the approved structural drawings.
  • Assembly drawings for each member, and single-part drawings with dimensions and holes.
  • Connection details covering plates, bolts and welds, with bolt schedules.
  • Bills of materials (BOM), and NC/DXF fabrication files where required.
  • Submission for the consultant’s approval, and revision to comments before fabrication.

A general description of this type of work, not a detailed statement of this project’s scope.

Related services

:

Contact us

Discuss your project with us

Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Riyadh Site visits and project coordination
Working hours Sunday to Thursday, 9:00 to 18:00 Riyadh time
Contact card Save to contacts