Saudi Arabia · Egypt Client portal +966 59 700 9855 a.fathy@arabcreators.co
Arab Creators Group

Home / Engineering consultancy / Villa quantity takeoff

Villa quantity takeoff with every quantity tied to a sheet

We take off the villa item by item, from excavation to paint, in an Excel workbook with live formulas. Each quantity points to its sheet, and any estimate is declared.

Tender quantity take-off (all disciplines)Priced per: 100 m²

Starting from · before VATSaudi riyal 90
Minimum orderSaudi riyal 2,000

Scope

What you receive

Excavation, backfill, plain and reinforced concrete quantities
Reinforcement tonnage by diameter
Blockwork, plaster, waterproofing and thermal insulation
Floors, skirting, walls, ceilings and paint
Doors, windows, marble, kitchens and bathrooms
Electrical, HVAC and plumbing items by count and length
A BOQ in Excel with live formulas
A reference file linking each item to its source in the drawings

Prices

Published prices for this service

ServiceCodePrice (SAR)UnitMinimum
Tender quantity take-off (all disciplines)QTO-10090100 m²2,000
BOQ pricingBOQ-PR55100 m²1,500

Prices are before 15% VAT in Saudi Arabia and match our quote calculator. The final price is fixed in the quotation after we review the drawings.

How we take off a villa

A villa takeoff begins with reading the whole set and identifying addenda and revisions, then every item is measured on the sheet where it appears. The BOQ is arranged by trade: earthworks, concrete, masonry, plaster, insulation, finishes and then MEP.

  • Each item has a unit and a visible formula in the cell.
  • The source sheet or section is written beside the quantity.
  • Quantities assumed because a drawing is incomplete are declared in a notes column.

We begin with a project-wide sheet holding floor areas, perimeters and clear heights, from which many quantities derive, such as plaster, paint and insulation. We then take off concrete element by element: footings, tie beams, columns, beams, slabs and stairs, with the dimensions of each element visible in the table so you can check them.

Structuring the villa

A typical villa has an annex, a boundary wall and sometimes a pool, so we separate the main building from the annex and external works. That makes pricing and bid comparison simpler. Items driven by opening sizes, such as doors and windows, are kept in separate schedules by size and count.

See the villa with pool and courtyard project for the type of drawings we work with, and our article on quantity takeoff step by step for the method.

For electrical work we count points, switches, panels and conduit and cable lengths from the drawings. For plumbing we count fixtures and pipe lengths by diameter, and for HVAC the number of units and duct lengths. Whatever is not shown on the drawings is declared as a separate estimate instead of being blended into the figures.

From takeoff to pricing

The work can stop at the takeoff or continue to pricing the BOQ with materials, labour and equipment, followed by indirect costs and profit. In both cases you get an Excel file that can be edited without breaking the formulas.

An independent second engineer reviews the takeoff before delivery and compares the main totals with ratios per square metre for similar buildings to catch large errors. The difference between the two services is explained on the quantity takeoff and BOQ pricing page.

The file opens with a summary of the main quantities and a table of notes and open questions that need a reply from the designer. You can then use the file directly to request subcontractor quotes, or to compare an offer you received against the real quantities.

Price

Quantity takeoff for all disciplines costs 90 SAR per 100 m2 of built-up area, minimum 2,000 SAR. BOQ pricing costs 55 SAR per 100 m2, minimum 1,500 SAR. Both are before VAT. Worked example only, for a villa with 600 m2 built-up area: takeoff 6 x 90 = 540 SAR, so the 2,000 SAR minimum applies; pricing 6 x 55 = 330 SAR, so the 1,500 SAR minimum applies; the total is 3,500 SAR before VAT, plus 15% VAT in KSA.

The delivery date is fixed in the quote according to scope. Quantities and rates are meant for your tender and negotiation; any drawings that accompany them are prepared for review, approval and stamping by your licensed engineer in the project country, and we do not stamp drawings.

To start, send the complete drawings and say whether you want the takeoff alone or with pricing. We review the set free of charge and confirm the built-up area on which the price is based, then send the quote. On delivery we explain the structure of the file and how to update it, so you can change specifications or rates later without repeating the takeoff.

Before we start

What we need from you

Full architectural drawings in PDF or DWG
Structural drawings and sections
MEP drawings, if available
Specification list and finish schedule
Whether you want the takeoff alone or takeoff with pricing

How it works

Four steps from drawings to delivery

01

Send your drawings

Send the IFC (issued for construction) or tender drawings.

02

Fixed quote

We review the drawings and send a fixed quote within 24 hours.

03

50% advance

Work starts as soon as the advance payment is received.

04

Delivery

Drawings are delivered for review; DWG files are released after final payment.

Frequently asked questions

Does the takeoff include MEP?

Yes. The price covers all disciplines, based on the drawings you send.

How do I verify a quantity?

Each item is linked to its sheet or section, and the formula is visible in the Excel cell.

What about items not shown on the drawings?

Where needed we estimate them, and the estimate is declared in the notes column.

Can I order the takeoff without pricing?

Yes. The takeoff is 90 SAR per 100 m2 and pricing is a separate service at 55 SAR per 100 m2.

Is the first consultation free?

Yes, and an NDA is available on request.

Free sample sheet

Free sample sheet on your own project before any order

Send your project drawings on WhatsApp and we will prepare a free sample sheet, so you can judge the quality before you commit to an order.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Head office 15th of May City, Cairo
Riyadh Office being established
Working hours Sun to Thu · 9:00 am to 5:00 pm
Contact card Save to contacts