Saudi Arabia · Egypt Client portal +966 59 700 9855 a.fathy@arabcreators.co
Arab Creators Engineering Consultancy

Architectural conceptPrivate residence · Riyadh · 2026

Stone and Timber Villa

A private villa in Riyadh in honed beige limestone with vertical teak fins on stainless brackets, symmetrical about its axis. Date palms and a rear pool in the garden, and a double-height living room opening to it.

A concept designed by Arab Creators, not a built project.

Facades and garden

Main facade, late afternoon Stone and Timber Villa · Architectural concept
Rear garden and pool Stone and Timber Villa · Architectural concept
Facade at blue hour Stone and Timber Villa · Architectural concept
Double-height living room Stone and Timber Villa · Architectural concept
Timber screen meets stone Stone and Timber Villa · Architectural concept

More angles

Front elevation on axis Stone and Timber Villa · Architectural concept
Cantilever and timber screen Stone and Timber Villa · Architectural concept
The plot from above Stone and Timber Villa · Architectural concept
Living room axis to the garden Stone and Timber Villa · Architectural concept
Living room from the shelves Stone and Timber Villa · Architectural concept
Travertine table, louver shadows Stone and Timber Villa · Architectural concept

Materials and details

  • Honed beige limestone, 600x300 mm
  • Vertical teak fins, stainless brackets
  • Slim aluminium frames, double glazing
  • Desert planting: date palms, native shrubs

Video

Quick walk through the villa
Villa angles

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: