Saudi Arabia · Egypt Client portal +966 59 700 9855 a.fathy@arabcreators.co
Arab Creators Group

Home / Engineering consultancy / Villa facade design and 3D renders

Villa facade design and 3D renders before construction

We design the villa facade and its architectural layout, then produce realistic 3D renders that show the final look before you buy materials. You can also order renders alone for a design you already hold.

Photo-real 3D renderPriced per: view

Starting from · before VATSaudi riyal 667
Minimum orderSaudi riyal 2,000

Scope

What you receive

Massing study and the arrangement of facade openings
Selection of materials, colours, cornices and lighting
Architectural plans, elevations and sections
Photo-real exterior render from the angles you agree
Courtyard, pool and entrance views where needed
Facade revisions after your comments within the agreed scope
DWG and PDF files and high-resolution render images
A solid base for moving to architectural shop drawings

Prices

Published prices for this service

ServiceCodePrice (SAR)UnitMinimum
Photo-real 3D renderENG-3D667view2,000
Architectural designENG-ARC35m²15,000

Prices are before 15% VAT in Saudi Arabia and match our quote calculator. The final price is fixed in the quotation after we review the drawings.

From idea to facade

A successful facade depends on proportion between masses and openings before it depends on materials. We begin with the building mass, the entrance and the sun path, then propose window layouts, projections and canopies, and show you the options before going into detail.

  • Orientation of the main facade towards the street and neighbours.
  • Protruding and recessed masses that create shadow.
  • Materials: stone, render, timber, metal and glass.

At the start we collect a reference file of images, facade style and family preferences, and summarise it in a direction board shown to you before drawing. This saves time and avoids redesign midway. We agree the style, whether modern, classical or contemporary Gulf, and the materials available locally.

The 3D render

A realistic render settles long discussions. We build the model to the real dimensions of the drawings, so the render is not a picture detached from construction, then add materials, lighting, planting and surroundings. Each view is delivered in high resolution, suitable for the family or for a municipality submission.

See the villa with pool and courtyard project for an example of the result, and our article on villa design cost in 2026 for general budgeting.

The architectural design covers the layout of rooms, halls, kitchen, entrance and annexes, with sensible proportions and attention to privacy, ventilation and daylight, within the plot area and building limits. Plans carry the main dimensions so that they serve as a base for structural and MEP drawings.

After the design

Once you settle on the facade, we move to execution with architectural shop drawings, so what is built matches what you saw in the render. The design can also link to wider architectural design or interior design.

The render is not limited to the exterior daytime image. On request we provide night views that show lighting, a view of the entrance and boundary wall, and a courtyard view. These give you a chance to choose colours and lighting before purchase, so costly changes during construction are fewer.

Price

Architectural design costs 35 SAR per m2, minimum 15,000 SAR, and a photo-real 3D render costs 667 SAR per view, minimum 2,000 SAR, both before VAT. Worked example only, for a 500 m2 villa: 500 x 35 = 17,500 SAR, and three views 3 x 667 = 2,001 SAR. VAT of 15% applies in KSA.

The delivery date is fixed in the quote according to scope. Accompanying drawings are prepared for review, approval and stamping by your licensed consultant or engineer in the project country; we do not stamp drawings for authorities.

To start, send the plot area, the family requirements and photos of facades you like. We discuss the idea in a free consultation, then send a quote based on the design area and the number of views. We usually present two facade directions in the first stage; you pick one and we develop it, then produce the final renders once you have confirmed the interior layouts. Extra views can be ordered later at the same price per view.

Before we start

What we need from you

Plot area, dimensions and building limits
Number of floors and rooms, and the family's requirements
Photos or examples of facades you like
Municipality or zoning requirements, if any
Existing drawings if you only need renders

How it works

Four steps from drawings to delivery

01

Send your drawings

Send the IFC (issued for construction) or tender drawings.

02

Fixed quote

We review the drawings and send a fixed quote within 24 hours.

03

50% advance

Work starts as soon as the advance payment is received.

04

Delivery

Drawings are delivered for review; DWG files are released after final payment.

Frequently asked questions

Can I order renders without the design?

Yes. A render costs 667 SAR per view, minimum 2,000 SAR, on a design you already have.

How many views do I get?

We agree the number with you; each view is priced separately.

Can the facade be revised?

Yes, within the scope agreed in the quote.

Can the design become construction drawings?

Yes, through architectural shop drawings, priced separately.

Is the first consultation free?

Yes, and we sign an NDA on request.

Free sample sheet

Free sample sheet on your own project before any order

Send your project drawings on WhatsApp and we will prepare a free sample sheet, so you can judge the quality before you commit to an order.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Head office 15th of May City, Cairo
Riyadh Office being established
Working hours Sun to Thu · 9:00 am to 5:00 pm
Contact card Save to contacts