
Home / Engineering consultancy / Shop drawings and quantity take-off in Qatar
Shop drawings, quantity take-off and engineering design for projects in Qatar
We prepare shop drawings, quantity take-offs, BOQ pricing and engineering design for projects in Doha, Al Rayyan, Al Wakrah and other cities in Qatar, remotely, at prices published in advance and shown in QAR in our quote calculator, with files delivered electronically.
Architectural shop drawingsPriced per: sheet (A1)
Scope
What you receive
Prices
Published prices for this service
| Service | Code | Price (SAR) | Unit | Minimum |
|---|---|---|---|---|
| Architectural shop drawings | SD-ARC | 165 | sheet (A1) | 1,500 |
| Structural shop drawings with BBS | SD-STR | 195 | sheet (A1) | 1,500 |
| Coordinated MEP shop drawings | SD-MEP | 175 | sheet (A1) | 1,500 |
| Tender quantity take-off (all disciplines) | QTO-100 | 90 | 100 m² | 2,000 |
| BOQ pricing | BOQ-PR | 55 | 100 m² | 1,500 |
Prices are before 15% VAT in Saudi Arabia and match our quote calculator. The final price is fixed in the quotation after we review the drawings.
What we deliver for projects in Qatar
We work with contractors, consultants and owners in Doha, Al Rayyan, Al Wakrah and other cities in Qatar on villas, residential and commercial buildings and fit-out works. We receive the drawings in DWG or PDF, send the scope, price and delivery date, then deliver the files electronically and answer consultant comments within the agreed scope.
An independent second engineer reviews every set before delivery.
Codes and specifications
We follow the project specification and the consultant's requirements. In Qatar we work to the Qatar Construction Specifications (QCS 2014) where the project names them. If two sheets, or a drawing and the specification, conflict, we record it and send it to you before delivery instead of resolving it by a silent assumption.
Official stamping and prices
We provide technical services remotely. Drawings that need an official stamp in Qatar go through an office or contractor licensed there; we prepare the technical work. Prices in the table are in Saudi riyals before any local tax, and the quote calculator shows the total in QAR when you choose your country. The Gulf currency table is on our Gulf services page.
Before we start
What we need from you
How it works
Four steps from drawings to delivery
Send your drawings
Send the IFC (issued for construction) or tender drawings.
Fixed quote
We review the drawings and send a fixed quote within one working day.
50% advance
Work starts as soon as the advance payment is received.
Delivery
Drawings are delivered for review; DWG files are released after final payment.
Frequently asked questions
Do you work on projects in Qatar?
Yes. We provide technical services remotely for projects in Qatar and deliver the files electronically.
Do you stamp drawings?
No. Drawings that need an official stamp go through an office or contractor licensed in the project country; we prepare the technical work.
Which currency are prices in?
Our price list is in Saudi riyals, and the quote calculator shows the total in QAR before any local tax.
How do we start?
Send the drawings on WhatsApp or through the request form; we review them and send the scope, price and delivery date.
Specialised services
Detailed pages for what contractors and owners ask for most
Try us before you sign
A free quantity take-off of one sheet, delivered within two days
Send one drawing sheet (PDF or DWG) on WhatsApp and get a free quantity take-off of it, delivered within two days. One sheet per client, quantities only (no pricing), villas and mid-size buildings.

