Saudi Arabia · Egypt Client portal +966 59 700 9855 a.fathy@arabcreators.co
Arab Creators Group

Home / Engineering consultancy / As-built drawings

As-built drawings that match what was built on site

We update the project drawings to reflect the executed work after site notes and changes. You rely on them for final handover, maintenance and any later extension.

As-built drawingsPriced per: sheet (A1)

Starting from · before VATSaudi riyal 105
Minimum orderSaudi riyal 1,000
On every project
24 hours to a fixed quote
24-48 hours to delivery
2 consultant-comment rounds included
NDA signed on every project

Scope

What you receive

Architectural drawings updated to the actual measurements
Structural drawings updated for changes in columns and beams
Electrical, HVAC and plumbing routes updated as installed
Changes marked with revision clouds and a table of differences
Positions of openings, sleeves and concealed runs
Title block, consultant stamp box and revision control
DWG and PDF files ready for handover
A clean copy plus a difference log between design and execution

Prices

Published prices for this service

ServiceCodePrice (SAR)UnitMinimum
As-built drawingsSD-ASB105sheet (A1)1,000

Prices are before 15% VAT in Saudi Arabia and match our quote calculator. The final price is fixed in the quotation after we review the drawings.

What as-built drawings mean

As-built drawings are the final version of the set after every change made during construction is recorded. A wall may move, a pipe route may change or an opening may grow, and if none of it is recorded the information is lost at handover and the problem appears at the first maintenance visit.

We receive the original sheets with the site marks and update them sheet by sheet so that they match the real building.

Common differences are small opening positions, concealed pipe and cable routes inside walls and ceilings, floor levels and equipment positions. These are exactly what a maintenance technician looks for years later, and what the team usually forgets under pressure at the end of a project.

How we work

  • We compare the site marks with the original sheets and log each difference.
  • We update the drawing and place a revision cloud around every change.
  • We cross-check the systems against each other, so a pipe does not appear on one sheet and vanish on another.
  • We issue a table of differences between design and execution.

If a mark is unclear we send you a short list of questions instead of guessing, and any assumption we must make is stated on the sheet.

Each updated sheet follows a clear convention: revision number, date and a description of the change. We keep the previous version untouched, so you can go back to the sheet before the update and compare it with the new one. Each sheet also states the source of the information, whether a site mark, a measurement or a photo.

When to order

They are usually ordered before final handover, release of the last payment or transfer of ownership, and they help operation and maintenance companies. For projects that never had shop drawings, you can start with shop drawings and then update them. Our shop drawing submittal checklist covers what to include.

As-built drawings do not replace inspection; they document the data you gave us. We therefore separate what is confirmed by site marks from what is assumed, and declare the latter in the difference log so that site can verify it before final handover.

Price

As-built drawings cost 105 SAR per A1 sheet, with a minimum order of 1,000 SAR before VAT. Worked example only: 15 sheets x 105 = 1,575 SAR before VAT, plus 15% VAT in KSA.

The delivery date is fixed in the quote according to scope and the condition of the site marks. Drawings are prepared for review, approval and stamping by your licensed consultant or engineer in the project country; we do not stamp drawings for authorities. An independent second engineer checks the files before delivery.

To start, send the original sheets and the site marks. We review them free of charge and tell you whether the data is sufficient and what is missing, then send the quote. Marks arranged by floor and by system speed up the work and cut questions. On large projects we suggest beginning with one typical floor for your review and then completing the rest the same way. At the end we hand over a list of points that remain unconfirmed.

Before we start

What we need from you

The issued-for-construction drawings at the latest revision
Hand-marked site prints or dated photos
Measured dimensions for the larger changes
Variation orders that changed the design during execution
Subcontractor notes on concealed routes

How it works

Four steps from drawings to delivery

01

Send your drawings

Send the IFC (issued for construction) or tender drawings.

02

Fixed quote

We review the drawings and send a fixed quote within 24 hours.

03

50% advance

Work starts as soon as the advance payment is received.

04

Delivery

Drawings are delivered for review; DWG files are released after final payment.

See a sample set

Four A1 sheets for a residential villa: architectural, structural, HVAC and fire protection: free to download.

View the sample

Frequently asked questions

What do I need to start?

The original sheets with site marks or photos, and measurements for the larger changes.

Do you survey the site yourselves?

We work remotely from your data and do not measure on site. Anything undocumented is raised as a question before drawing.

Will the differences be visible?

Yes, through revision clouds and a table of differences.

What files do you deliver?

DWG and PDF with a title block and a consultant stamp box.

Is the first consultation free?

Yes, and we sign an NDA on request.

Free sample sheet

Free sample sheet on your own project before any order

Send your project drawings on WhatsApp and we will prepare a free sample sheet, so you can judge the quality before you commit to an order.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Head office 15th of May City, Cairo
Riyadh Office being established
Working hours Sun to Thu · 9:00 am to 5:00 pm
Contact card Save to contacts