
Home / Engineering consultancy / Shop drawings and quantity take-off in Jeddah
Shop drawings, quantity take-off and engineering design for projects in Jeddah
We prepare shop drawings, quantity take-offs, BOQ pricing and engineering design for contractors, consultants and owners in Jeddah, at prices published in Saudi riyals, following the Saudi Building Code (SBC).
Architectural shop drawingsPriced per: sheet (A1)
Scope
What you receive
Prices
Published prices for this service
| Service | Code | Price (SAR) | Unit | Minimum |
|---|---|---|---|---|
| Architectural shop drawings | SD-ARC | 165 | sheet (A1) | 1,500 |
| Structural shop drawings with BBS | SD-STR | 195 | sheet (A1) | 1,500 |
| Coordinated MEP shop drawings | SD-MEP | 175 | sheet (A1) | 1,500 |
| Tender quantity take-off (all disciplines) | QTO-100 | 90 | 100 m² | 2,000 |
| BOQ pricing | BOQ-PR | 55 | 100 m² | 1,500 |
Prices are before 15% VAT in Saudi Arabia and match our quote calculator. The final price is fixed in the quotation after we review the drawings.
Our services for projects in Jeddah
We serve projects in Jeddah, Makkah and the rest of the Western Region remotely: villas, residential and commercial buildings and fit-out works. We receive the drawings in DWG or PDF, send the scope, price and delivery date, then deliver the files electronically and answer consultant comments within the scope.
An independent second engineer reviews every set before delivery.
Site visits and coordination
We work on Jeddah projects remotely and coordinate with your site team through the photos and measurements you send; site visits are free within Riyadh and arranged case by case in other cities on request.
Stamping and VAT
Our drawings are prepared for review, approval and stamping by the project's licensed consultant or engineer; we do not stamp drawings for authorities. Prices are in SAR before VAT, and 15% VAT is added in the Kingdom. For a quick estimate use the quote calculator.
Before we start
What we need from you
How it works
Four steps from drawings to delivery
Send your drawings
Send the IFC (issued for construction) or tender drawings.
Fixed quote
We review the drawings and send a fixed quote within one working day.
50% advance
Work starts as soon as the advance payment is received.
Delivery
Drawings are delivered for review; DWG files are released after final payment.
Related pages
Quantity takeoff and BOQ pricing · Structural shop drawings · Instant quote calculator
Frequently asked questions
Do you work on projects in Jeddah?
Yes, and we deliver the files electronically for projects in Jeddah.
Do you follow the Saudi Building Code?
Yes. We follow the Saudi Building Code (SBC) and the project consultant's specification.
Do prices include VAT?
No. Prices are before VAT, and 15% VAT is added in the Kingdom.
Do you visit the site?
We work on Jeddah projects remotely and coordinate with your site team through the photos and measurements you send; site visits are free within Riyadh and arranged case by case in other cities on request.
Specialised services
Detailed pages for what contractors and owners ask for most
Try us before you sign
A free quantity take-off of one sheet, delivered within two days
Send one drawing sheet (PDF or DWG) on WhatsApp and get a free quantity take-off of it, delivered within two days. One sheet per client, quantities only (no pricing), villas and mid-size buildings.

