Saudi Arabia · Egypt Client portal +966 59 700 9855 a.fathy@arabcreators.co
Arab Creators Engineering Consultancy

Home / Engineering consultancy / Shop drawings and quantity take-off in Dammam and Al Khobar

Shop drawings, quantity take-off and engineering design for projects in Dammam and Al Khobar

We prepare shop drawings, quantity take-offs, BOQ pricing and engineering design for contractors, consultants and owners in Dammam and Al Khobar, at prices published in Saudi riyals, following the Saudi Building Code (SBC).

Architectural shop drawingsPriced per: sheet (A1)

Starting from · before VATSaudi riyal 165
Minimum orderSaudi riyal 1,500
On every project
1 working day to a fixed quote
24-48 hours to delivery
2 consultant-comment rounds included
NDA on request, signed before files are received

Scope

What you receive

Architectural and structural shop drawings with bar bending schedules (BBS)
Coordinated MEP shop drawings with a combined services drawing
Tender quantity take-off for all disciplines
BOQ pricing with clear line items
Architectural, structural and MEP design for villas and buildings
Steel structure design, connection design and fabrication drawings
Interior design and photo-real 3D renders
Project HSE plan and remote technical follow-up

Prices

Published prices for this service

ServiceCodePrice (SAR)UnitMinimum
Architectural shop drawingsSD-ARC165sheet (A1)1,500
Structural shop drawings with BBSSD-STR195sheet (A1)1,500
Coordinated MEP shop drawingsSD-MEP175sheet (A1)1,500
Tender quantity take-off (all disciplines)QTO-10090100 m²2,000
BOQ pricingBOQ-PR55100 m²1,500

Prices are before 15% VAT in Saudi Arabia and match our quote calculator. The final price is fixed in the quotation after we review the drawings.

Our services for projects in Dammam and Al Khobar

We serve projects in Dammam, Al Khobar, Dhahran, Jubail and the Eastern Province remotely; one example is an interior design proposal for a corporate office in Al Khobar. We receive the drawings in DWG or PDF, send the scope, price and delivery date, then deliver the files electronically and answer consultant comments within the scope.

An independent second engineer reviews every set before delivery.

Site visits and coordination

We work on Eastern Province projects remotely and coordinate with your site team through the photos and measurements you send; site visits are free within Riyadh and arranged case by case in other cities on request.

Stamping and VAT

Our drawings are prepared for review, approval and stamping by the project's licensed consultant or engineer; we do not stamp drawings for authorities. Prices are in SAR before VAT, and 15% VAT is added in the Kingdom. For a quick estimate use the quote calculator.

Before we start

What we need from you

Drawings in DWG or PDF
Project specification and consultant requirements
The code or specification the project names
Required delivery date
Any earlier consultant or authority comments

How it works

Four steps from drawings to delivery

01

Send your drawings

Send the IFC (issued for construction) or tender drawings.

02

Fixed quote

We review the drawings and send a fixed quote within one working day.

03

50% advance

Work starts as soon as the advance payment is received.

04

Delivery

Drawings are delivered for review; DWG files are released after final payment.

See a sample set

Four A1 sheets for a residential villa: architectural, structural, HVAC and fire protection: free to download.

View the sample

Frequently asked questions

Do you work on projects in Dammam and Al Khobar?

Yes, and we deliver the files electronically for projects in Dammam and Al Khobar.

Do you follow the Saudi Building Code?

Yes. We follow the Saudi Building Code (SBC) and the project consultant's specification.

Do prices include VAT?

No. Prices are before VAT, and 15% VAT is added in the Kingdom.

Do you visit the site?

We work on Eastern Province projects remotely and coordinate with your site team through the photos and measurements you send; site visits are free within Riyadh and arranged case by case in other cities on request.

Try us before you sign

A free quantity take-off of one sheet, delivered within two days

Send one drawing sheet (PDF or DWG) on WhatsApp and get a free quantity take-off of it, delivered within two days. One sheet per client, quantities only (no pricing), villas and mid-size buildings.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Riyadh Site visits and project coordination
Working hours Sunday to Thursday, 9:00 to 18:00 Riyadh time
Contact card Save to contacts