Earned value

القيمة المكتسبة

A method that measures progress and cost together against the plan.

Category: Contracts & management

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Earned value compares three figures: planned value (PV) of work scheduled, earned value (EV) of work actually done at planned prices, and actual cost (AC). From them come the schedule performance index SPI = EV ÷ PV and the cost performance index CPI = EV ÷ AC.

Why it matters on a project

It shows early whether a project is late or over cost even when spending looks normal. An index below 1 means delay or overrun.

Measurement and pricing

Needs a cost-loaded programme (such as Primavera P6) and recorded percent complete for each activity.

Worked example

PV 1,000,000 SAR, EV 900,000 and AC 950,000: SPI = 900,000 ÷ 1,000,000 = 0.90 (behind), CPI = 900,000 ÷ 950,000 = 0.95 (over cost).

Common mistake

Measuring progress from money spent instead of work actually done, so a late project looks on track.

Frequently asked questions

Does earned value need special software?

It can be done in Excel, but Primavera P6 makes it easier with a cost-loaded programme.

How does it differ from an S-curve?

The S-curve shows planned and actual; earned value adds actual cost against the value of work done.

Related terms

  • Baseline programmeThe programme approved at project start against which progress is measured.
  • S-curveA cumulative progress or cost curve over time.
  • Progress reportA periodic report of what was done, what slipped and why.
  • Cash flowThe timing of money coming in and going out over the project.