Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

GRC (glass-fibre reinforced concrete)

خرسانة مسلحة بالألياف الزجاجية

A cement mix reinforced with alkali-resistant glass fibres, lightweight, used for facades and ornament.

Category: Structure & materials

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Glass-fibre reinforced concrete is a light cement mix reinforced with glass fibres and cast in moulds to make decorative facade elements such as arches, cornices and screens.

Why it matters on a project

It gives complex shapes at much less weight than stone or ordinary concrete, but fixing it needs proper details and joint sealing.

Measurement and pricing

Measured in square metres, linear metres or per piece depending on the shape.

Common mistake

Fixing panels without a designed steel frame, or leaving joints unsealed, so water gets in and panels crack.

Frequently asked questions

What is the difference between GRC and GRG?

GRC is cement-based and weather-resistant for exteriors; GRG is gypsum-based for interior ceilings and features.

Does GRC withstand sun and humidity?

Yes, if made with the right mix, fixed on a suitable frame and its joints are sealed.

Related terms

  • Elevation (facade)A drawing of the building’s external face showing openings, materials and heights.
  • Gypsum ornamentClassical decorative elements cast in gypsum for ceilings, cornices and internal columns.
  • Flexible polyurea sealantA flexible joint filler tolerating movement and chemicals, used in industrial floors.
  • Shop drawingsDrawings prepared by the contractor or fabricator showing how items are made and installed, approved by the consultant before execution.

Read next

Does your project need structural design and reinforcement drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote