Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Gypsum board (drywall)

جبس بورد

Gypsum panels on metal framing for dry walls and ceilings.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Gypsum board is plasterboard faced with paper and fixed to a metal frame to form suspended ceilings and internal partitions. Types include standard, moisture-resistant and fire-rated.

Why it matters on a project

It is quick and clean to install, but the wrong type causes problems: standard board fails in bathrooms.

Measurement and pricing

Measured in square metres per face, stating type, thickness and number of layers.

Worked example

A partition 4 m long and 3 m high, one layer each side: 4 × 3 × 2 = 24 m² of board.

Common mistake

Using standard board in bathrooms and kitchens instead of moisture-resistant board.

Frequently asked questions

What do gypsum board colours mean?

Commonly white or grey is standard, green moisture-resistant and pink or red fire-rated; always confirm on the product label.

Do gypsum partitions block sound?

They do when designed with double layers and insulation inside; a basic partition gives limited sound reduction.

Related terms

  • Suspended (false) ceilingA secondary ceiling hung below the structural slab to conceal services and improve acoustics and lighting.
  • Putty (skim coat)A thin smooth layer over plaster preparing the surface for paint.
  • Gypsum ornamentClassical decorative elements cast in gypsum for ceilings, cornices and internal columns.
  • Emulsion paintWater-based paint for internal walls and ceilings, in various sheen levels.

Read next

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote