Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Porcelain tiles

بورسلين

High-density, low-absorption ceramic tiles suited to heavy-use floors.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Porcelain tiles are dense ceramic tiles with very low water absorption, fired at high temperature and used on floors and walls inside and out.

Why it matters on a project

They resist wear and moisture better than ordinary ceramic, but large formats need a very flat floor, proper adhesive and the right laying method.

Measurement and pricing

Measured in square metres plus a cutting waste allowance; skirting in linear metres.

Worked example

A 4 × 5 m room = 20 m², with 10% waste = 22 m²; at 1.44 m² per box that is 22 ÷ 1.44 = 15.3, so 16 boxes.

Common mistake

Laying with spot-fixed traditional mortar instead of full-bed adhesive, so tiles sound hollow and crack.

Frequently asked questions

What is the difference between porcelain and ceramic?

Porcelain is denser, absorbs less water and is stronger; ceramic is lighter, cheaper and suits interior walls.

How wide should tile joints be?

The manufacturer and size decide; often 2 to 3 mm for rectified porcelain.

Related terms

  • MarbleA natural stone used for floors, walls and stairs, requiring periodic surface protection.
  • Waste allowanceA percentage added to material quantities to cover cutting, damage and site loss.
  • WaterproofingLayers preventing water ingress into structural elements or spaces, such as bituminous membranes and cementitious coatings.
  • LevelThe vertical height of a point relative to a datum (zero level).

Read next

  • Work out quantities with our free calculators: concrete, tiles, paint and plaster. Open the calculators

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote